4
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
ASSEMBLY
• Set the Main Frame
[A]
in an upright position with the boxed area at the top.
Attach the Base Rails
[B]
to the lower side rails with (4 each) M10 x 1.5 x 25mm
Bolts, Nuts and Lockwashers
(FIG 1)
.
• Arrange the Hydraulic Pump Unit
[C]
along the Frame
[A]
side member with
the hose at the downward end. Attach with (3 each) M8 x 1.25 x 16mm Bolts,
Washers and Lockwashers
(FIG 2)
.
• Center and set the Upper Yoke Plate
[E]
on the top of the boxed Frame section
with the Lower Yoke Plate
[F]
under it with the Roll Pins facing upward and
between Frame rails.
• Secure with (2) M10 x 1.5 x 110mm Shoulder Bolts, Washers and Nuts
(FIG 3)
.
NOTE:
Do Not overtighten bolts and distort the Upper Yoke Plate.
• Unthread and remove the pre-installed Lock Collar from the Ram
[G]
and place
it aside for later re-installation
(FIG 4)
.
• Insert the Ram
[G]
with the hose connection end facing upward, through the
center holes of the Yoke Plates
[E]
&
[F]
. Thread the previously removed
Lock Collar onto the threads of the Ram
[G]
(FIG 5)
.
• Slip the Nylon Seal
[J]
over the threaded fitting of the Force Gauge
[H]
then
install it with the Gauge facing forward
(FIG 6)
.
FIG. 1
FIG. 1
FIG. 2
FIG. 2
FIG. 3
FIG. 3
FIG. 4
FIG. 4
FIG. 5
FIG. 5
FIG. 6
FIG. 6