Eastwood 20269 Скачать руководство пользователя страница 4

© Copyright 2018 Easthill Group, Inc.     8/18     Instruction item #20269Q     Rev 1

If you have any questions about the use of this product, please contact 

The Eastwood Technical Assistance Service Department: 800.343.9353  >>  email: [email protected]

PDF version of this manual is available at eastwood.com

The Eastwood Company     263 Shoemaker Road, Pottstown, PA 19464, USA 

800.343.9353     eastwood.com

ADDITIONAL ITEMS

#51088

 

Shrinker/Stretcher Set

#13475

 

Eastwood Electric Metal Shears

#11797

 

Throatless Shear

#14042

 

Versa Bend Sheet Metal Brake

#20254

 

Eastwood 24” Slip Roll

SET UP AND OPERATION

•  Follow the specific model Bead Roller 

Instructions for complete Bead Roller set-
up and operation. If the Instruction Manual 
originally supplied with an Eastwood Bead 
Roller is unavailable, contact Eastwood at 
www.Eastwood.com or call 1-800-345-
1178 to request a replacement.

•  Install Dies so that the outer edge of the 

flare of the Positive Die just meets the  
stop face of the Negative Die 

(FIG 1)

.

•  Adjust the spacing between the Dies to 

allow for the gauge of metal to be formed 

(FIG 2)

.

•  Slowly feed the metal panel between the 

Dies keeping the edge firmly against the 
stop face of the Negative Die 

(FIG 3)

.

STORAGE

•  Apply a thin film of light oil or rust- 

preventive to all bare steel areas. 

•  Store in a clean, dust-free, dry, dampness-

free area, preferably covered with plastic. 

FIG. 1

FIG. 2

FIG. 3

Positive 

Die

Negative 

Die

Stop 

Face

Отзывы: