EASTRON SDM630MV-2L Dual Load User Manual
Address: No.1369 Chengnan Road, Jiaxing, Zhejiang, 314001, China.
Tel: 0086-573-83698881/83698882 Fax: 0086-573-83698883 Web: www.eastron.com.cn
1
From the set-up menu, use
and
buttons to select the dIt option.
The screen will show the currently selected
integration time.
2-1
Press
to enter the selection
routine. The current time interval will flash
Press
to exit the dIt selection routine and return to the menu.
CT
The CT option sets the primary current(CT2 fixed 0.333V) of the current transformer (CT) that
wires to the meter.
1
From the Set-up menu, use
and
buttons to select the CT option.
The screen will show the current CT
primary current value.
2
Secondary CT(CT2)
It’s fixed 0.333V, and can not be set.
C1.CT2
Circuit 1
C2.CT2
Circuit 2
From the Set-up menu, use
and
buttons to select the CT
primary(CT1).
Its’ default 5A,and ranged from 0005 to
9999