Installation

We recommend that the connecting wire which is used to connect the 
meter to the outside circuit should be sized according to local codes 
and regulations for the capacity of the circuit breaker or over current 
device used in the circuit.
An external switch or a circuit-breaker should be installed on the inlet 
wire, which will be used as a disconnection device for the meter. And 
there it is recommended that the switch or circuit-breaker is near the 
meter so that it is more convenience for the operator. The switch or 
circuit-breaker should comply with the specications of the buildings 
electrical design and all local regulations.
The meter has to be installed against a wall which is re resistant.
The meter has to be installed in a good ventilated and dry place.
T h e m e t e r h a s t o b e i n s t a l l e d i n a p r o t e c t i o n b o x w h e n p l a c e d i n 
dangerous or dusty environment.
The meter can be installed and used after being tested and sealed with 
a letter press printing.
The meter can be installed on a 35mm DIN rail or direct on a meter board 
with screws.
The meter should be installed in an available height so that it is easy 
to read.
When the meter is installed in an area with frequent surges due to e.q. 
thunderstorms, welding machines, inverters etc, protect the meter with 
Surge Protection Devices.
After nishing installation, the meter must be sealed to prevent tampering.
Wiring of the wires should be done in accordance with the underneath 
connection diagram.

6

Wiring Diagram

1/5
2/6
3/7
4
9/10

JIAXING EASTRON ELECTRONIC INSTRUMENTS CO., LTD.

Add: No.1369 Chengnan Road, Nanhu, Jiaxing, Zhejiang, 314001, China

Tel: +86-573-83698881 /83698882             Fax: +86-573-83698883
Email:[email protected]                 Web:www.eastrongroup.com

Operation

8

Consumption indication

On the SDM630D's front panel, there are four LEDs, in which top three 
LEDs are for three phase voltage and the other one is impulse indication 
for active energy measurement. The constant of the impulse is shown 
on the nameplate of the meter.

Reading the meter

The SDM630D energy meter is equipped with 6+1 LCD display, which 
is used as recording consumption and can't be reset to zero.

Pulse output

SDM630D DIN rail energy meter is equipped with a pulse output which 
is fully separated from the inside circuit. T h a t g e n e r a t e s pulses in 
proportion to the measured energy. They are test pulse output (pins 
9 & 10). Usually, the test pulse output is used as testing accuracy or reading 
purpose in close quarters. 
The test pulse output is a polarity dependant, passive transistor output 
requiring an external voltage source for correct operation. For this 
external voltage source, the voltage (Ui) should be 5-27V DC, and the 
maximum input current (Imax) should be 27mA DC. To connect the 
impulse output, connect 5-27V DC to connector 9 (anode), and the 
signal wire (s) to connector 10 (cathode). The meter pulse is indicated 
on the front panel.

Ia  IN/OUT
Ib  IN/OUT
Ic  IN/OUT
Neutral wire
Test pulse output contact