Eastron SDM530-MT User Manual
- 11 -
2-2
Use
and
to set
the first digit and press
to
confirm your selection. The next digit will
flash.
2-3
Repeat the procedure for the remaining
three digits
2-4
After setting the last digit, SET will show.
Press
to exit the number setting routine and return to the Set-up menu. SET will
be removed
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: 1, 5, 8,10, 15, 30,60 minutes
1
From
the
set-up
menu,
use
and
buttons
to select the DIT option. The screen will
show the currently selected integration
time.
Default is 60
2-1
Press
to enter the selection
routine.
The current time interval will flash