
4
With 2 Adults
place Step 7
Assembly into the
ground using the
Pole Stabilizers.
Step 7 Assembly
x1
x2
9
Pole Stabilizer
STEP 8
Step 7 Assembly
9
Connect Step
Assembly 5 to
Step Assembly 4.
NOTE: Follow
Steps A through
C to properly
assemble Net
System.
Step 4 Assembly
x2
Step 5 Assembly
x1
STEP 6
C
A
B
Step 5 Assembly
Step 4 Assembly
NOTE:
Both Top
Tension Adjuster
Balls are
pre-assembled to
the Net.
Tie on Tension
Adjuster Ball to the
string on the
bottom of the Net.
Connect the
Tension Adjuster
Balls to the Tension
Adjuster Rings.
Repeat for Both
Sides.
Step 6 Assembly
x2
x2
8
Tension Adjuster - Ball
STEP 7
Step 6 Assembly
8
Содержание NS005
Страница 7: ...6 STEP 12 TOPVIEWCOURTSETUP HAVE FUN Consult Rule Book for court size and game rules for Volleyball ...
Страница 11: ...10 20 Commerce Boulevard Succasunna NJ 07876 1 973 585 4747 ...
Страница 12: ...NS005 185 194 20 Commerce Boulevard Succasunna NJ 07876 1 973 585 4747 PRINTED IN CHINA ...