ADJUSTMENTS AND REPLACEMENTS
Additional Service Procedures
06DEC05
AR4366-1
Page
203 of 219
Setting the Calibration
Preparing the CASSETTES
Important
You must start with the 35 x 43 CASSETTE.
1
Move the LATCH to the left to release
the PHOSPHOR SCREEN.
2
Remove the PHOSPHOR SCREEN
from the CASSETTE.
3
Check that the PHOSPHOR SCREEN:
•
edges are not lifted
•
does not have changes in color
4
Do the procedure for
5
Install the PHOSPHOR SCREEN into
the CASSETTE.
6
Insert a tool into the hole to snap and
close the CASSETTE.
7
Close the LATCH on the CASSETTE.
8
Check that the LATCH on the
CASSETTE is operating correctly.
9
At the main menu, click [Erase Cassette].
10
Insert the CASSETTE into the CR 500 SYSTEM.
11
Do
-
for all of the CASSETTES.
Open
To
H195_1103GC
KC
VM
DSFIFJO
LZX
T U
B E S I D
E
FLEXIBLE
CASSETTE
PHOSPHOR
SCREEN
LATCH
hole
H195_1103GCA
Содержание 4366
Страница 4: ...ADJUSTMENTS AND REPLACEMENTS 06DEC05 AR4366 1 Page 4 of 219 Setting the Calibration 203 ...
Страница 45: ...ADJUSTMENTS AND REPLACEMENTS Adjustments 06DEC05 AR4366 1 Page 45 of 219 Postrequisites None ...
Страница 57: ...ADJUSTMENTS AND REPLACEMENTS Replacements 06DEC05 AR4366 1 Page 57 of 219 ...