22 Adjustments
Top Tape Head Height Adjustment
Use the hand crank at the top of the mast to adjust the top tape head height to
accommodate box height, as shown in the following illustration. Turn the crank counter-
clockwise to raise the tape head. Turn the crank clockwise to lower the tape head.
Top Squeezer Adjustment
(When equipped with optional top squeezers.)
If optional top squeezers are installed, adjust top squeezers to the box width, moving
each box guide horizontally to the required width. Keep squeezer guides equal distance
from the tape head center to keep the box centered on the conveyor and to keep the
tape seal centered on the box seam.
Rotate top crank
handle to raise
or lower top tape
head.
Содержание BB-2T
Страница 1: ...BB 2 3T Bottom Belt Case Taping System User Guide...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ...10 Introduction Dimensions Dimensions shown are in inches...
Страница 30: ...30 Illustrated Parts List Parts List Electrical 2 1 1a...
Страница 37: ...Appendix A Electrical Schematic 37 Appendix A Electrical Schematic...
Страница 41: ......
Страница 42: ......