Plasmasonic
®
DRSSTC Instruction Manual
December 2019, REV -
− 25 −
http://www.EasternVoltageResearch.com
Plasmasonic
®
1.3 DRSSTC Instruction Manual
5. Install the secondary coil assembly to the top of the Plasmasonic base
assembly. There are two mounting bolts and a secondary ground wire which must
pass through their respective holes in the Plasmasonic base assembly. Secure the
cecondary coil assembly to the top of the Plasmasonic base assembly using the
provided ¼-20” nuts. DO NOT use nylon locknuts!
6. Connect the Secondary Coil Assembly ground wire to the heatsink GND
terminal. There are two green wires that are attached to a single point via a hex
screw on the heatsink. This is the heatsink GND terminal. Using the appropriate
allen key or similar tool, unscrew this GND terminal screw, and connect the
secondary coil ground wire to this point along with the two other green GND
wires as shown in the photo below. Be sure that the three (3) ground wires are
routed in a such a way that they do not come into close proximity with other high
voltage or power wires in the base assembly. Do NOT overtighten this screw or
you may stripped the aluminum threads in the heatsink!
Failure to properly ground the secondary coil will cause the Plasmasonic DRSSTC
system to operate improperly and cause the system to fail.
7. Place the toroid on top of the secondary coil assembly. Secure the toroid with
the provided nylon ¼-20 nut. Do NOT overtighten this nut. The mounting bolt is
made from insulated fiberglass and may break if it is overtightened!