
Page 1
Livestock Tent
SSL202012 20’x20’x12’
W6.0xL6.0xH3.7m
Assembly Instructions
RECOMMENDED TOOLS
Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored.
THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE.
Before you start: 4+ individual recommended for assembly, approximate time 5 hr.
Содержание SSL202012
Страница 5: ...Page 5 Frame Installation Step 1 base plates and stake pegs...
Страница 6: ...Page 6 Step 2 arch No 1 Step 3 middle arches No 2 3...
Страница 7: ...Page 7 Step 4 arch No 4 and portals and fences...
Страница 8: ...Page 8 Step 5 purlins and sidewall fences...
Страница 9: ...Page 9 Step 6 squaring up the frame and fix base plates by stake peg...
Страница 10: ...Page 10 Cover Installation Step 1 back cover...
Страница 11: ...Page 11 Step 2 roof cover Now your assembly is completed...