background image

3

Intended use

This product is intended to be used as a 

measurement device that, together with 

an Easee Equalizer, will optimize energy 

utilization in buildings. It will enable 

automatic load balancing between the 

Easee Charging Robot(s) and the building 

for those that do not have a smart meter 

installed. 

Operating conditions

The product must be connected to an Easee 

Equalizer with the cable provided. 

For installation and operation purposes, 

a smartphone with internet connection is 

needed. 

Optimal performance

The Equalizer Amp together with the Easee 

Equalizer makes it possible to charge 

smarter, safer and faster without the need 

of a smart meter, if the installation is scaled 

accordingly.

Introduction

Product overview

Equalizer Amp

x3

Power cable

Current sensors

DIN bracket

Expansion connector

Содержание Equalizer Amp

Страница 1: ...Equalizer Amp EN DE User guide Installation guide Benutzeranleitung Installationsanleitung...

Страница 2: ...structions Technical specifications Installation Installation instructions Daily use and operation Practical details 3 3 4 4 5 9 Table of contents IMPORTANT Read carefully before use Keep for future r...

Страница 3: ...lled Operating conditions The product must be connected to an Easee Equalizer with the cable provided For installation and operation purposes a smartphone with internet connection is needed Optimal pe...

Страница 4: ...led inside a cabinet protected from the weather Do not immerse the product in water or other liquids Avoid direct sunlight or heat exposure Keep product away from open flames and extreme heat Make sur...

Страница 5: ...ocal regional and national regulations for electrical installations must be respected WARNING Turn off the power before you begin the installation Use extreme caution and follow instructions carefully...

Страница 6: ...er in front or behind the main fuse The arrow on the sensor must point towards the load L1 L2 L3 2 Plug the current sensors L1 L2 and L3 into their respective terminals 1 2 and 3 Terminal 4 5 and 6 ar...

Страница 7: ...or connecting multiple Equalizer Amps CHECK LIST Before powering up the Equalizer Amp make sure that The current direction is correct on the current sensors The charging sites and the Equalizer Amp ha...

Страница 8: ...obile phone Equalizer Setting up 4 1 Go to Ongoing sites or Update existing site and select your site 2 Under Site structure select Add Equalizer 3 Enter the WiFi information the same network the char...

Страница 9: ...is available at the following internet address easee support Maintenance This product requires no maintenance If it needs to be repaired please contact your Easee supplier Storage The product should b...

Страница 10: ...Easee AS Easee and all other Easee product names and slogans are trademarks or registered trademarks of Easee AS Easee products can be protected by one or more patents All other products and services...

Страница 11: ...20 Easee AS Grenseveien 19 4313 Sandnes Norway easee com...

Отзывы: