Assembly Instructions:
STEP 1:
Unpack all parts from shipping carton to ensure no parts are missing. Refer to the exploded view.
STEP 2:
Remove two (#27) 1/4-20 x 1/2” shipping bolts and two (#21) 1/4-20 lock nuts from the motor support
assembly and the hopper. The 1/4-20 x 1/2” shipping bolts are no longer required and can be disposed of,
keep the two 1/4-20 lock nuts for the next step.
STEP 3:
Next install (#4) four 1/4-20 x 1-1/2” bolts through the motor support assembly and then through
the hopper. Now attach (#16) frame to each side as shown above.
NOTE
: Keep in mind that you may need to
remove one frame tube to fit through the tubular luggage rack if your quad is equipped with one as shown on
the next page.
STEP 4:
Next remove (#20) from (#11) Gauge & Lever assembly. Depending on whether the M30 is mounted
to the front or rear rack, you will need to install (#11) Gauge & Lever assembly to either the right or left (#16)
Frame tube to allow for use with the non-throttle hand. Insert (#20) from the bottom of (#16) Frame and
then through (#11) Gauge & Lever assembly, and then secure with the wing nut and tighten firmly to allow
movement and not allow the lever to move unassisted.
STEP 5:
Now install the M30 on your quad as outlined on
the following page.
20
21
21
4
4
23
12
11
6
34
(27
Discard during assembly
)
8
21
21
20
16