EarthWay 2170T Скачать руководство пользователя страница 4

Gauge & Lever

Control Rod

Tabbed Hole

Control Rod

Lever Tension Nut

  1

0  

 15

   3

0

 

14. 

Install (1) 1/4-20 regular nut (not a locknut) 

on to control rod as shown.

15. 

Install flattened end of control rod in to lever on gauge as shown. Turn to lock in 

place.  Next push lever forward to setting “0”.  Align control rod with hole in pivot 

bracket, pull lever backward to insert control rod through hole in pivot bracket.  Now 

install 1/4-20 regular nut on to control rod.  

16. 

Pull lever back to setting “30” as shown.  Next push pivot & bracket forward 

so that the shut off plate in the hopper is in the full open position. 

REMEMBER 

SETTING  “30” ON THE FLOW CONTROL LEVER MUST PLACE THE 

SHUT-OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY 

CALIBRATED.

  Now tighten the nuts against the pivot bracket to prevent change in 

calibration.

17. 

Tension on the flow control lever may be adjusted by tightening or loosening the 

tension nut as shown.

1/4-20

Regular Nuts

Pivot 

Bracket

Control

Rod

18. 

Insert agitator to pinion shaft on inside of hopper.  

Note:

 the position of flat side of the agitator.  This pin 

should be installed as shown.

PAGE 4

1/4-20 x 1”

Hex Head Bolt

Stainless

1/4-20 Lock Nut

Stainless

19.

 

Install debris screen into hopper, then insert 

1/4-20 x 1” Stainless Steel Hex Bolt thru the hole in 

the side wall of the hopper.  Secure with Stainless 

Steel lock nut - 

TIGHTEN WITH HAND TOOLS 

ONLY

Отзывы: