SHC-410-CP (01/13)

 

 

Page 8 

Final charging is done in the HEAT mode

 as follows, with the charging set up described in 

Figure 6: 

1.  Continue measuring the refrigerant charge weight as shown in Figure 6. 

2.  Be sure that air entering the air handler is between 70°F and 80°F.  If the system is a 

hydronic primary circuit, circulating water is to be held between 95°F and 105°F. 

3.  Close the HP valve. 

Then turn the system on in the HEAT mode

.  

4.  Initiate final charging by opening the refrigerant container valve and the gage manifold 

LP valve to allow liquid refrigerant to enter the system 

SLOWLY 

as shown in Figure 6. 

The ACC will not allow liquid refrigerant to enter the compressor. 

5.  Adding liquid refrigerant will raise the liquid level in the ACC.  Continue to add liquid 

refrigerant to the system until the liquid level has reached the middle sight glass, as 
shown in Figure 7. 

6. 

When the liquid level is at the middle sight glass, as shown in Figure 7, turn the 
refrigerant container valve OFF. 

7.  When the system has run for 20 minutes (in HEAT mode), read the evaporating 

temperature and condensing temperature. 

The evaporating temperature can be read by attaching a thermocouple lead to the 
Earth Loop Vapor Line with electrical tape, then wrapped with ½” thick insulation.  The 
condensing temperature can be read by attaching a thermocouple lead to the Air 
Handler/CC/HWM liquid line coming into the compressor unit with electrical tape, then 
wrapped with ½” thick insulation.  Use an accurate temperature indicator. 

In Figure 8, locate the evaporating temperature on the horizontal axis.  The 
corresponding condensing temperature reading should fall between the upper and 
lower parallel lines in Figure 8. 

The temperature profile in Figure 8 is valid for the air handler systems with an 
air flow of 400CFM per Ton

.  If condensing temperature is above acceptable range, 

the air flow is low. If condensing temperature is below the acceptable range, air flow is 
too high. 

Adjust air flow as appropriate.

 

Содержание SHC-410-CP

Страница 1: ...SHC 410 CP 01 13 Copyright 2013 Earthlinked Technologies Inc EarthLinked CHARGING PROCESS for R 410A Heating and Cooling Systems...

Страница 2: ...Failure to provide installation and service by an authorized trained installer in a manner consistent with the subject manuals will void and nullify the limited warranty coverage for the system READ T...

Страница 3: ...essor unit while preparing refrigerant connections trickle dry nitrogen through the compressor unit entering at the access port nearest Active Charge Control ACC to keep airborne moisture out of the c...

Страница 4: ...CFM capacity to the Gage Block 5 Connect the Refrigerant Hose from the Refrigerant Container to the Charging Port 6 Initiate the system evacuation Evacuate the system down to 230 MICRONS as read on th...

Страница 5: ...Gage from the liquid Earth Loop Service Valve until the initial refrigerant charge is complete 8 Open the refrigerant container valve and inject liquid refrigerant into the charging port as shown in F...

Страница 6: ...ic hot water by field installed desuperheater 3 SD Yes Yes Yes 1 Air heating and cooling domestic hot water by desuperheater 1 Includes Desuperheater Model DSH 1872 to supplement water heating Figure...

Страница 7: ...SHC 410 CP 01 13 Page 7 Figure 4 Primary Circuit with Hydronic Water Module HWM Figure 5 Primary Circuit with Compressor Unit Heat Exchanger...

Страница 8: ...level is at the middle sight glass as shown in Figure 7 turn the refrigerant container valve OFF 7 When the system has run for 20 minutes in HEAT mode read the evaporating temperature and condensing t...

Страница 9: ...p for SC SD and SCW Compressor Units SC Model shown 8 Check the suction saturation temperature to verify that it is within 3 F for the measured suction pressure The suction temperature should be appro...

Страница 10: ...SHC 410 CP 01 13 Page 10 Figure 7 Charge at Middle Sight Glass Figure 8 EarthLinked Performance Parameters...

Страница 11: ...n the ACC See Figure 9 Document the total weight of the refrigerant charge to the system Figure 9 Charge at Top Sight Glass 11 The following additional steps in the system start up process are require...

Страница 12: ...all ETI Technical services at 1 863 701 0096 2 When the liquid refrigerant level drops below the ACC lowest sight glass observe the INLINE sight glass not the ACC sight glasses for the status of the r...

Страница 13: ...eds no further adjustment Go to item 9 Figure 12 Few Bubbles Inline Sight Glass 3 The TXV is to be adjusted to provide 10 F to 15 F superheat while running in cooling mode The first step is to utilize...

Страница 14: ...168 2 150 610 6 65 183 2 Figure 14 Pressure Temperature for R 410A 6 To determine the degrees of Superheat subtract the saturation temperature from the suction temperature read at the compressor sucti...

Страница 15: ...SHC 410 CP 01 13 Page 15 Figure 15 Cooling Mode Start Up Process NOTE TXV ADJUSTMENT DOES NOT APPLY TO SCW SERIES COMPRESSOR UNITS...

Отзывы: