SC-410-QS (05/11)
Page 27
7. Close the LP and HP valves on the gage block. Disconnect the vacuum pump
and the utility hose from the gage block. Disconnect the digital micron gage from
the liquid earth loop service valve.
8. Open the refrigerant container valve and
inject liquid refrigerant into the
charging port
as shown in Figure 20.
9.
For SC, SD and SCW Compressor Units:
Charge with liquid refrigerant until
3
pounds
of refrigerant per ton of system capacity, has entered the system.
Liquid entering the system at the charging port goes directly to the system earth
loops. It does not go to the compressor. Should the pressures equalize and
prevent the intended charge from entering completely, terminate the process of
initial charging.
10. When the initial refrigerant charge (see step 9 above) has entered the system,
close the refrigerant container valve and disconnect the refrigerant hose from the
charging port.
11. The system has now been initially charged.
b. Final Charge
It is critical to control the conditions under which the compressor unit operates while final
charging the system.
Air Handler Systems
If heating is provided by one of the following DX air handler systems, as shown in
Figure 21, the return air to the air handler during the final charging is to be
maintained in the range of 70°F to 80°F.
If necessary, the air can be warmed with
electric supplemental heat in the air handler. (Shunt “R” to “W2” at the terminal block.)
Содержание SC Series
Страница 7: ...SC 410 QS 05 11 Page 7...
Страница 8: ...SC 410 QS 05 11 Page 8 Figure 5 SC Connections for R 410A...
Страница 9: ...SC 410 QS 05 11 Page 9 Figure 6 SC Internal Flow Schematic...
Страница 10: ...SC 410 QS 05 11 Page 10 Figure 7 SC Piping...
Страница 11: ...SC 410 QS 05 11 Page 11 Figure 8a SC Air Heating and Cooling...
Страница 13: ...SC 410 QS 05 11 Page 13 Figure 9 SC Radiant Panel Hydronic Heating and Air Chilled Water Cooling...
Страница 15: ...SC 410 QS 05 11 Page 15 Figure 11 SC Electrical Ladder Diagram 230 1 60...
Страница 16: ...SC 410 QS 05 11 Page 16 Figure 12 SC Electrical Schematic 230 1 60...
Страница 17: ...SC 410 QS 05 11 Page 17 Figure 13 SC Series 230 3 60 Electrical Ladder Diagram...
Страница 18: ...SC 410 QS 05 11 Page 18 Figure 14 SC Series 230 3 60 Electrical Schematic...
Страница 19: ...SC 410 QS 05 11 Page 19 Figure 15 SC Series 460 3 60 Electrical Ladder Diagram...
Страница 20: ...SC 410 QS 05 11 Page 20 Figure 16 SC Series 460 3 60 Electrical Schematic...
Страница 21: ...SC 410 QS 05 11 Page 21 Figure 17 SC Series 575 3 60 Electrical Ladder Diagram...
Страница 22: ...SC 410 QS 05 11 Page 22 Figure 18 SC Series 575 3 60 Electrical Schematic...
Страница 23: ...SC 410 QS 05 11 Page 23 Figure 19 Part 1 of 2 SC Field Wiring Diagram...
Страница 24: ...SC 410 QS 05 11 Page 24 Figure 19 Part 2 of 2 SC Field Wiring Diagram...
Страница 32: ...SC 410 QS 05 11 Page 32 Figure 26 Correct Final Charge Level Figure 26a EarthLinked Performance Parameters...
Страница 35: ...SC 410 QS 05 11 Page 35 Figure 30 CAV Adjustment Process Flow Chart...