background image

SV-407-KIT (01/12) 

 

Page 5 

SV KIT INSTALLATION

 

1.  After ensuring the compressor unit and earth loop line set has no refrigerant or nitrogen holding 

charge, and after power has been turned “OFF” to the compressor unit and all other 
EarthLinked® and field supplied system components (at the appropriate breakers), remove the 
front and top panels of the compressor unit cabinet. 

2.  Within the compressor unit, locate the charging port on the earth loop liquid line. Remove the 

core and connect a nitrogen tank hose to the charging port, which will be used later to purge the 
earth loop system of oxygen. 

3.  Cut the VAPOR line in convenient proximity to the compressor unit, as shown in Figure 2. The 

line should be cut squarely, maintaining the roundness of the tube ends. Deburr the cut ends 
and clean the cut ends of the tubing. 

 

Figure 2. Cut Location for Vapor Tube 

4.  Adjust the VAPOR service valve so it is in the “open” position. Remove the service port core 

from the valve. Clean the inside of the service valve line set ports and 

insert the line set 

tubing into the service valve so the service port is on the earth loop side of the valve. 
See Figures 3 and 4.

 

Содержание R-407C

Страница 1: ...01 12 Copyright 2012 Earthlinked Technologies Inc EarthLinked Service Valve Kit and Adapter Kit Installation Manual for R 407C Heating and Cooling Systems CONTENTS PAGE Pre Installation 3 SV Kit Inst...

Страница 2: ...Heating and Cooling Systems Installation Operation and Maintenance Manual Failure to provide installation and service by an authorized trained installer in a manner consistent with these manuals will...

Страница 3: ...4 x 5 8 3 8 x 5 16 3 8 5 8 3 8 3 4 HC HCW AKHC 24 1 2 x 3 8 3 4 x 5 8 3 8 5 8 HW HWW AKHW 24 1 2 x 3 8 7 8 x 3 4 3 8 3 4 030 SV 2436 SC SD SCW SW AKS 30 1 2 x 3 8 3 4 x 3 4 3 8 3 4 3 8 3 4 HC HCW AKHC...

Страница 4: ...2 x 1 2 1 1 8 x 7 8 1 2 7 8 072 SV 7200 SC SD SCW SW AKS 72 1 2 x 1 2 1 1 8 x 7 8 1 2 7 8 1 2 1 1 8 HC HCW AKHC 72 1 2 x 1 2 1 1 8 x 7 8 1 2 1 1 8 HW HWW AKHW 72 1 2 x 1 2 1 1 8 x 7 8 1 2 1 1 8 All s...

Страница 5: ...connect a nitrogen tank hose to the charging port which will be used later to purge the earth loop system of oxygen 3 Cut the VAPOR line in convenient proximity to the compressor unit as shown in Fig...

Страница 6: ...Figure 4 Service Valve Installed in Vapor Line 5 Cut the LIQUID line and repeat steps 3 and 4 except replace the service port cap on the LIQUID service valve 6 Wrap a wet cloth around the VAPOR servic...

Страница 7: ...SV 407 KIT 01 12 Page 7 Figure 5 Service Valve Wrap 7 Place a flame retardant heat shield between the joint to be brazed and the wet cloth See Figure 6 Figure 6 Heat Shield...

Страница 8: ...ith 15 silver content brazing alloy utilizing the NITROGEN BRAZING PROCESS 9 Braze the joint See Figure 7 Figure 7 Nitrogen Brazing the Joint 10 After brazing the joints on the VAPOR service valve rep...

Отзывы: