Specialty Applications: See-Thru

 

The  firebox  side  walls  must  sit  three  inches  (3”) 

on the base plate. Since the side wall components flair from 

three inches (3”) at the narrow end to eight inches (8”) on 

the wide end, the side walls will overhang the base plate by 

approximately five inches (5”) at their wide end. Support this 

overhang with masonry.

 

See-Thru or two-sided fireplaces can be constructed 

from the one-sided unit components by eliminating the back 

wall assembly.

 

In this installation the firebox side wall components 

are reversed so that the side wall taper sits to the outside of the 

box leaving the inside of the see-thru firebox with two straight 

and parallel interior walls.

 

Angle steel three inch by three inch by one quarter 

inch (3” x 3” x 1/4”) should be set on top of the side wall 

assembly to span each of the openings of the see-thru before 

the top plate is set into place.

 

The steel can be set with the angle leg either up or 

down.

B

A

C

Model

A

B

C

36”

43”

36 1/8”

53”

42”

49”

43 1/8”

59”

46”

53”

47 1/8”

63”

Содержание ISOKERN Standard 36

Страница 1: ...log appliance used in this product be installed in strict accordance with NFPA 58 NFPA 54 ANSI Z223 1 and the gas log manufacturer s explicit installation sizing and operation instructions It is the r...

Страница 2: ...intenance Information 11 Warranty Note Illustrations shown in this manual are not to scale and are intended to show typical installations Nominal dimensions are given for design and framing reference...

Страница 3: ...8 36 42 48 60 72 Standard Series 36 42 46 All units have either a 30 Finished opening height Standard Series or a 36 finished opening height Magnum Series The EM 40 chimney system is a single module r...

Страница 4: ...31 19 3 4 60 1 4 28 1 2 WEIGHT 1040 lbs 1300 lbs 1420 lbs 1600 lbs 28 Model comes with three 3 sidewalls MAGNUM SERIES 60 72 28 28 38 38 69 3 4 57 1 4 85 1 2 73 1 2 85 3 4 85 3 4 69 55 1 2 65 1 2 81...

Страница 5: ...A Base Plate B Side Wall B C D F E G H I C Back Wall D Damper Beam E Damper End F Smoke Dome G Top Sloping H Top Plate I EM40 Mono Block Number of Components May Vary with Different Kit Sizes Typical...

Страница 6: ...uld also be considered Hint Before application wet down the surface area then apply water dipped firebrick for improved adherence All required through wall accesses gas and electrical line feeds and c...

Страница 7: ...eel L support used in the masonry veneer around the front of the unit behind the veneer facing Any proposed brick stone or other masonry veneer facing must have sufficient foundation to support the fu...

Страница 8: ...sided unit components by eliminating the back wall assembly In this installation the firebox side wall components are reversed so that the side wall taper sits to the outside of the box leaving the i...

Страница 9: ...is activity must be avoided It is the responsibility of the building contractor to insure that the required dry in period is met and that the required lighting sequence is performed by the owner or by...

Страница 10: ...he heating season Inspect the flue periodically during the heating season for the presence of soot and creosote build up If creosote or soot has accumulated it should be removed to reduce the risk of...

Страница 11: ...Notes Maintenance Information 11...

Страница 12: ...sion thereof is not responsible for any labor costs or indirect costs incurred for the replacement of defective components Earthcore is not responsible for misuse or mishandling of components Nothing...

Отзывы: