E&C ITS 3000 Скачать руководство пользователя страница 3

1. Safety Information

Read the below listed instruction before installing or

operating your E&C ITS 3000.

Ø

Check whether the received materials are in good

condition.

Ø

To reduce the risk of electric shock disconnect the ITS

3000

from

the

power

outlet

before

installing

or

connecting to other equipment. Reconnect the power

cord only after all connections are made.

Ø

Any kind of metallic connector should be handled after

the power has been removed.

Ø

Connect the equipment to a three-wire AC outlet (two

poles plus ground) that is connected to appropriate

branch

circuit/mains

protection

(a fuse

or

circuit

breaker). Connection to any other type of receptacle

may result in a shock hazard.

Ø

To switch off and disengage the ITS 3000, press and

hold both UPS Off buttons for more than one second to

switch off the equipment, then disconnect the ITS 3000

from the AC power outlet.

Ø

Pluggable

equipment

includes

a

protective

earth

conductor which carries the leakage current from the

load devices (computer equipment). Total leakage

current must not exceed 3.5 mA.

Installation and Operation Manual

Page 2

Содержание ITS 3000

Страница 1: ...ITS 3000 Intelligent Transfer Switch 3000 Installation and Operation Manual An ISO 9001 2000 Company...

Страница 2: ...ion 4 3 1 What is ITS for 4 3 2 Redundancy 4 3 3 Double Backup 5 3 4 Front View 5 3 5 Rear View 5 4 Working Truth T able of ITS 3000 6 5 Installation Procedure 7 6 Specification 8 7 Our other products...

Страница 3: ...d Connect the equipment to a three wire AC outlet two poles plus ground that is connected to appropriate branch circuit mains protection a fuse or circuit breaker Connection to any other type of recep...

Страница 4: ...Power Cord Output 2 Installation and Operation Manual 1 Note Check whether all the above mentioned materials are received inact and report immediately to the shipping agent if there are any damages in...

Страница 5: ...ncy When all the above said three sources are available during the operation if UPS 1 fails the output supply of ITS 3000 will be transferred to UPS 2 automatically without any affect to the connected...

Страница 6: ...PS 2 will be running without any load If UPS 1 is shutting down due to Battery low UPS 2 will take care of the entire load automatically 3 4 Front View 3 5 Rear View Installation and Operation Manual...

Страница 7: ...and Operation Manual 4 Working Truth Table of ITS 3000 UPS 1 UPS 2 AC Utility Load ON On On On UPS 1 Off On On UPS 2 Off Off On AC Utility On Off On UPS 1 On Off Off UPS 1 On On Off UPS 1 Off On Off...

Страница 8: ...Utility ON and load on AC Utility Then check the output supply Step 5 Connect UPS 2 supply to ITS 3000 as per given socket and observe the LED indications on the front panel UPS 2 ON and load on UPS 2...

Страница 9: ...ction Full protection Overload protection Physical Dimension DxWxH mm 280x350x70 2U Net Weight Approx 8Kg Environment Operating Environment 0C 45C 20 85 relative humidity non condensing Noise Level Le...

Страница 10: ...Bhubaneshwar Chandigarh Chennai Cochin Coimbatore Calicut Dehradun Guwahati Gwalior Hubli Hyderabad Indore Jabalpur Jaipur Jammu Kanpur Kolkata Kottayam Ludhiana Lucknow Madurai Meerut Mumbai Munnar...

Отзывы: