7001-TP-001
Revision --
Page 6 of 8
Magnetic Compass
N/A __ Pass __ Fail __
Swing compass and adjust with EUT operating normally. If EUT causes erratic operation of magnetic
compass, then mark compass as Fail.
VHF Communications System
N/A __ Pass __ Fail __
Tune each comm receiver to a low, middle, and high frequency within its frequency range. Listen for
audio interference. Transmit on low, middle, and high frequencies. Listen on an external receiver for
audio interference.
GPS Navigation Receiver
N/A __ Pass __ Fail __
Check for proper operation. Observe signal to noise ratio readings to determine if reception is
interfered with.
Crew Interphone System
N/A __ Pass __ Fail __
Check for normal operation of the interphone system. Listen for excessive background noise.
ADF
N/A __ Pass __ Fail __
Check for needle offset. Listen for audio interference.
Glide Slope/LOC
N/A __ Pass __ Fail __
Check for needle offset. Perform test using TAC/30b or equivalent ground test equipment, or during
flight while established on an ILS glide slope.
Radio Altimeter
N/A __ Pass __ Fail __
Perform test with appropriate ground test equipment, or check reading in flight.
The space below is provided to include additional systems or devices not listed previously. These would
include any Transceivers, Nav Aids, Radar, or Auto Pilot systems. Use the Manufacturers test procedures
for each component listed with the EUT operating normally.
Other Equipment: __________________
N/A __ Pass __ Fail __
Describe test: _________________________________________________________________________
_____________________________________________________________________________________
Other Equipment: __________________
N/A __ Pass __ Fail __
Describe test: _________________________________________________________________________
_____________________________________________________________________________________
Other Equipment: __________________
N/A __ Pass __ Fail __
Describe test: _________________________________________________________________________
_____________________________________________________________________________________
Other Equipment: __________________
N/A __ Pass __ Fail __
Describe test: _________________________________________________________________________
_____________________________________________________________________________________
Содержание P178
Страница 2: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 10: ......
Страница 11: ......
Страница 12: ...7001 MI 001 Revision Page 2 of 11 Record of Revisions Revision Date Description 30 OCT 2014 Initial Release ...
Страница 17: ...7001 MI 001 Revision Page 7 of 11 Figure 2 Cable Wiring ...
Страница 22: ......
Страница 23: ......
Страница 24: ...7001 TP 001 Revision Page 2 of 8 Record of Revisions Revision Date Description 30 OCT 2014 Initial Release ...