![Eagle Access Control Systems X9S Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/eagle-access-control-systems/x9s/x9s_installation-and-owners-manual_3275850025.webp)
23
X9 Slide Rev - H
DIP-Switc
h Descriptions
Open
Input
(P/P)
Jolly
Input
Mode
(J)
Preflash
(Prel.)
Re-Closure
Timer
(Rich)
US1 Output
(US1)
Gate Release
Jolt
(C. Sg)
Power Closing
Jolt
(C.Ch)
Slowdown
(Rall)
During
OPENING
, activating P/P input
stops
gate, activating it again
closes
gate.
During
CLOSING
, activating P/P input
stops
gate, activating it again
opens
gate.
After changing DIP-switches, changes will take effect after:
•
Resetting the ECU (Momentarily short reset pins to RESET)
•
Shut power OFF and back ON again.
•
At the end of a complete gate cycle the new settings
will take effect.
During
OPENING
, activating P/P input
stops
gate, then
closes
.
During
CLOSING
, activating P/P input
stops
gate, then
opens
.
OFF
OFF
Open-Stop-Close
Open-Close
Open-Close
(NO reversal
during Opening)
Always Open
(House Complex)
1
O
N
2345678
9
10
11
12
P/P
J
Prel.
Rich
US1
C.Sg
Rall.
C.Ch
2 M.
Fot.R
1
O
N
2
During
OPENING
, activating P/P input has NO effect.
During
CLOSING
, activating P/P input
stops
gate, then
opens
.
OFF
ON
1
O
N
2
During
OPENING
, activating P/P input has NO effect. After open, activating it
again
closes
gate.
During
CLOSING
, activating P/P input
stops
gate, then
opens
.
ON
ON
1
O
N
2
ON
OFF
1
O
N
2
J1=TIMER input; closes the gate when the contact is opened and opens it when the contact is closed.
J2=third photocell input (FT3); intervenes only during opening and forces closing. Use N.C. contacts.
Stops
only
motor
M1
with
electric travel limits
. Use N.C. contacts (Single Operator)
For installations with 4 travel limits. Connect the travel limits of motor
M1
to the inputs FC and FC .
Connect the travel limits of motor
M2
to the inputs J1 and J2 . Use N.C. contacts
Excluded
- The flashing light operates together with the motor.
Both
M1
and
M2
motors are stopped using
electric travel limits
. Use N.C. contacts (Dual Operators)
OFF
OFF
J1=Timer
J2=FT 3
J1 = FCA M1
J2 = FCC M1
J1 = FCA M1
J2 = FCA M2
J1 = FCA M1
J2 = FCC M1
PA = FCA M2
PC = FCC M2
3
O
N
4
OFF
ON
3
O
N
4
ON
ON
3
O
N
4
OFF
5
O
N
Inserted
- The flashing light operates 5 seconds
before
any operation.
ON
5
ON
Excluded
- After one complete opening, the control unit only closes again with a
manual control
.
OFF
6
O
N
Inserted
- After one complete opening, the control unit closes
automatically
after the programmed
pause time (Auto-Close Timer).
ON
6
ON
Excluded
- Function excluded.
OFF
8
O
N
Inserted
- The gate release jolt is needed to
release
the
electric lock
. The gate with M1 installed will
carry out a brief
closing
movement
before
starting the
opening
cycle.
ON
8
ON
Excluded
- There is
NO slowdown
in the last part of travel.
OFF
9
O
N
Inserted
- With the slowdown function connected, the motor
halves
its speed at
end
of gate cycle.
ON
9
ON
Excluded
- Increased power closing is
NOT
carried out.
OFF
10
O
N
Inserted
- The
end
of closing cycle will
increase to full power
on motor M1.
ON
10
ON
1-2 Motors
(2 M)
1 Motor
- Only
M1
motor output is enabled. (Single Operator)
OFF
11
O
N
2 Motors
- Enables
both
M1
and
M2
motor outputs. (Dual Operator)
ON
11
ON
Re-Closing after
Photocells
(Fot.R)
Excluded
- Function excluded.
OFF
12
O
N
Inserted
- One Pass activation of a
photocell
reduces the pause time from what is was to ONLY
2 sec
.
ON
12
ON
Dry Contact
- This contact gives information regarding the status of the gate. The relay activates as
the gate begins to open and deactivates only after complete closing has been achieved.
OFF
7
O
N
CH 2 (OC2)
- Second radio channel output. If you don't use this function the second radio channel
will activate pedestrian opening. (Not Used)
ON
C
NC
NO
7
ON
ON
OFF
3
O
N
4
Pulling the 4 Amp fuse
will shut-off power.
ON / OFF
13
13
13
13
13
13
13
13
2
5
3
4
DIP-SWITCH DESCRIPTIONS
Reset
Momentarily short pins
to reset control board.
Содержание X9S
Страница 2: ...2 X9 Swing Rev H...
Страница 33: ...31 X9 Slide Rev H...