background image

                                         

Installation, Operation and Parts Manual 

EE-TS6600

 

                                                                                                                     

 

 14

4.4

 

Items

 

to

 

be

 

checked

 

after

 

installation.

 

S/N

 

Check

 

items

 

YES

 

NO

 

1

 

Rising

 

speed

 ≥ 

9/16”/s;

 

 

 

 

 

2

 

Noise

 

with

 

rated

 

load

 ≤

75db;

 

 

 

 

 

3

 

Grounding

 

resistance:

 

not

 

bigger

 

than

 

4

Ω

;

 

 

 

 

 

4

 

Mechanical

 

locks

 

can

 

engage

 

and

 

release

 

effectively.

   

 

 

 

 

5

 

If

 

the

 

control

 

button

 

works

 

as

 

“hold

 

to

 

run”?

   

 

 

 

 

6

 

If

 

grounding

 

wire

 

is

 

connected?

   

 

 

 

 

7

 

If

 

the

 

lift

 

rises

 

and

 

lowers

 

smoothly?

   

 

 

 

 

8

 

If

 

there

 

is

 

no

 

abnormal

 

noise

 

during

 

running

 

with

 

rated

 

load?

   

 

 

 

 

9

 

If

 

there

 

is

 

no

 

oil

 

leakage

 

when

 

running

 

with

 

rated

 

load?

   

 

 

 

 

10

 

If

 

max

 

lifting

 

height

 

is

 

47

 

1/4”?

 

 

 

 

 

11

 

If

 

safety

 

advices,

 

name

 

plate

 

and

 

logos

 

are

 

clear?

 

 

 

 

 

OPERATION

 

INSTRUCTIONS

 

5.1

 

Precautions

   

5.1.1

 

Check

 

all

 

connections

 

of

 

oil

 

hose.

 

Only

 

when

 

there

 

is

 

no

 

leakage,

 

the

 

lift

 

can

 

start

 

work.

   

5.1.2

 

The

 

lift,

 

if

 

its

 

safety

 

device

 

malfunctions,

 

shall

 

not

 

be

 

used.

 

5.1.3

 

It

 

shall

 

not

 

lift

 

or

 

lower

 

an

 

automobile

 

if

 

its

 

center

 

of

 

gravity

 

is

 

not

 

positioned

 

midw

ay

 

of

 

the

 

runways.

 

5.1.4

 

Operators

 

and

 

other

 

personnel

 

concerned

 

should

 

stand

 

in

 

a

 

safety

 

area

 

during

 

lifting

 

and

 

lowering

 

process.

   

5.1.5

 

Make

 

sure

 

the

 

safety

 

lock

 

of

 

the

 

lift

 

is

 

engaged

 

before

 

start

 

working

 

under

 

the

 

vehicle

 

and

 

no

 

people

 

under

 

the

 

vehicle

 

during

 

lifting

 

and

 

lowering

 

process.

 

5.2

 

Descriptions

 

of

 

operation

 

unit

   

   

 

Содержание EE-TS6600

Страница 1: ...atform Scissor Lift Mid Rise Lifting Capacity 6600 lbs Distributed by Please read this entire manual carefully and completely before installation or operation of the lift Installation Operation and Pa...

Страница 2: ...IONS 8 3 1 General descriptions 8 3 2 Construction of the lift 8 3 3 Dimensions 8 3 4 Technical data 8 INSTALLATION INSTRUCTIONS 9 4 1 Preparations before installation 9 4 2 Installation attentions 10...

Страница 3: ...er domestic legislation The reproduction or disclosure of instructions or an extract thereof is prohibited and offenders are liable to prosecution EAE reserves the right or initiates criminal proceedi...

Страница 4: ...rson to perform checking It must be ensure that the person chosen satisfies the requirements The user bears special responsibility if employees of the company are appointed as experts or qualified per...

Страница 5: ...ned 1 3 10The lift is simply designed to lift the entire body of vehicles with its maximum weight within the lifting capacity 1 3 11 Always insure the safety locks are engaged before any attempt to wo...

Страница 6: ...ushing In the event of excessive vehicle weight incorrect mounting of the vehicle or on removing heavy object there is a risk of the vehicle falling off the lifting platform or tipping up Safety measu...

Страница 7: ...ge The narrow base heavy weight and large size of the packs make stacking difficult and potentially dangerous If stacking is unavoidable use all appropriate precautions never stack to more than 2 mete...

Страница 8: ...e to move easily in your workshop when it is unloaded Being powered by an electro hydraulic system the gear pump delivers hydraulic oil to oil cylinders and pushes upwards their pistons to raise the l...

Страница 9: ...ation following consultation with the manufacturer s customer service or an authorized service agent Routing of the wiring to the installation location Refer also to the corresponding information on t...

Страница 10: ...Lifting pad TS6600 A03 B06 4 2 4 Hex socket cylinder head screw M6 20 M6 20 20 2 5 Circlip M17 M17 4 2 6 Nylon clip 4 200 4 3 Control unit 1 3 1 Power unit TS6600 A06 B01 1 3 2 Release handle TS6600 A...

Страница 11: ...p 1 Remove the packaging and take the mechanical and hydraulic assembly to the designated installing place Please do read and understand this manual thoroughly before next step Step 2 Fix the portable...

Страница 12: ...Installation Operation and Parts Manual EE TS6600 12 Step 4 Connect the oil hose Connect the fitting of oil hose with its tie in on the hydraulic block Step 5 Connect external power supply...

Страница 13: ...is below 18 degree Celsius Change the oil 6 months after initial use and change once per year thereafter Step 7 Trial running After reviewing these instructions get familiar with lift controls by run...

Страница 14: ...If max lifting height is 47 1 4 11 If safety advices name plate and logos are clear OPERATION INSTRUCTIONS 5 1 Precautions 5 1 1 Check all connections of oil hose Only when there is no leakage the li...

Страница 15: ...ratches will be left due to long time use Raise the lift Make sure vehicle is neither front nor rear heavy and center of balance should be midway between adapters and centered over the lift 1 Make sur...

Страница 16: ...d Clean or make adjustment Damaged gear pump Replace it Too low oil level Add oil The hose connection is loose Tighten it The cushion valve is not well screwed up or jammed Clean or make adjustment Pl...

Страница 17: ...asualty Check whether oil hose is well connected and whether it leaks or not Check the electrical system Check if safety teeth and safety block matched well or not 6 2 Weekly checking items Check the...

Страница 18: ...ectrical schemes and parts list Pos Code Name Specification Qty M 320205003 Motor 110V 1 5kW 1PH 60HZ 4P 1 KM 320901014 AC contactor CJX2 1210 AC110 1 SB1 320401011 Button AR22F0R 10 W 1 QM 321204021...

Страница 19: ...ic schemes and parts list 1 oil tank 2 oil sucking filter 3 gear pump 4 coupling 5 motor 6 composite hydraulic block 7 cushion valve 8 overflow valve 9 single way valve 10 manual unloading valve 11 fl...

Страница 20: ...101010 Straight connector G1 4 G1 4 2 5 624001847 Rubber oil hose L 200mm 2 6 615006003 Three way connector 6214E A4 B4 6214A A5 B2 1 7 310101010 Straight connector G1 4 G1 4 1 8 615033013 Cylinder 2...

Страница 21: ...Installation Operation and Parts Manual EE TS6600 21 POS Code Name Specification Qty 1 330405014 Oil tank 6L 1 2 330101004 Hydraulic block YF 2 1 3 330304001 Overflow valve EYF C 1...

Страница 22: ...1 8 202109064 Screw M6 30 4 9 320201308B Gear pump CBK F216 G 1 10 310101003 Straight connector M14 1 5 G1 4 1 11 330404001 Coupling YL A 1 12 330401001 Oil sucking tube YX BL 170 1 13 330403001 Oil s...

Страница 23: ...4 5 410330151 Pin shaft TS6600 A01 B05 2 6 410330121 Down shaft of oil cylinder TS6600 A01 B06 2 7 410330191 Shaft of the down wheel TS6600 A01 B07 2 8 410330411 UP shaft of oil cylinder TS6600 A01 B0...

Страница 24: ...ing 6435B A4 B30 2 29 420040040 Square lifting pad 6254E A7 B2 4 30 420040250 Round lifting pad 6254E A7 B4 C4 4 31 420210060B Padding block 6603B A5 B6 2 32 204301007 Circlip M20 4 33 203103011 Flat...

Страница 25: ...X43 2 4 Power unit 110V 1PH 60HZ 1 5KW 1 5 204301004 Circlip D15_GB894_1 2 6 420480080 Handle sheath D22X100 2 7 204201004 Spring washer D8_GB_T93 8 8 204101005 Flat washer D8_GB_T97_1 8 9 615048003 H...

Отзывы: