Installation, Operation and Parts Manual
EE-65A.40T
18
Step 10: Fix oil hose protection covers.
4.4 Items to be checked after installation.
S/N
Check items
YES
NO
1
Screw torque of expansion bolts : 60-80N•m;
2
Rising speed ≥20mm/s;
3
Noise with rated load ≤75db;
4
Grounding resistance: not bigger than 4Ω;
5
Height difference of the two platform ≤5mm;
6
Mechanical locks are robust and synchronized when running with rated load ;
7
If the control button works as “hold to run”?
8
If limit switches work well?
9
If grounding wire is connected?
10
If the lift rises and lowers smoothly?
11
If there is no abnormal noise during running with rated load?
12
If there is no oil leakage when running with rated load?
13
If there is no air leakage when running with rated load?
14
If expansion bolts, nuts or circlips are well secured?
15
If max lifting height is 1930mm?
16
If safety advices, name plate and logos are clear?
Содержание EE-65A.40T
Страница 12: ...Installation Operation and Parts Manual EE 65A 40T 12 Surface mounting...
Страница 25: ...Installation Operation and Parts Manual EE 65A 40T 25...
Страница 26: ...Installation Operation and Parts Manual EE 65A 40T 26...
Страница 37: ......