
Installation, Operation and Parts Manual
EE-6501
12
3.5 Technical data
Rated load capacity
3000kg
Full rise height
1850mm
Full lowered height
110mm
Full rise time with load
≤60s
Full lowering time with load
≤40s
Hydraulic pressure
24MPa
Pneumatic pressure
6-8bar
Oil tank volume
10L
INSTALLATION INSTRUCTIONS
4.1 Preparations before installation
4.1.1 Space requirements.
Refer to 3.3 for the dimensions of the lift. There must also be a clearance of at least 1 meter between the lifting platform and fixed
elements (e.g. wall) in all lifting positions. There must be sufficient space at the ends of the lifting platform for driving vehicles on and off.
To stop vehicles colliding with the ceiling, it is advisable to fit an overhead light barrier in low ceiling buildings.
4.1.2 Foundations and connections
The user must have the following work performed before erecting the lift.
Construction of the foundation following consultation with the manufacturer’s customer service or an authorized service agent.
Routing of the wiring to the installation location.
The user must provide fuse protection for the connection.
Electrical system
connection must be done by licensed technicians.
Requirements for power supply cable of the installation site: at least 2.5mm
2
wire
core for 3Ph power and 4.0mm
2
wire core for 1Ph power.
Refer also to the corresponding information on the name plate and in the operation instructions. Before doing electrical
connection, make sure the lift is electrically adapt to the local power supply.
Routing of the compressed air connection to the installation location.
4.1.3 Foundations preparations
Indoor installation only.
There must also be a clearance of at least 1 meter between the lifting platform and fixed elements (e.g. wall) in all lifting positions.
There must be sufficient space for driving vehicles on and off.
C20/25 concrete base with strength more than 3000psi, Minimum thickness of 150mm.
Surface: Horizontal and even (Gradients max. 0.5 %)
Newly built concrete ground must be older than 20days.
In mm.
Содержание EE-6501
Страница 10: ...Installation Operation and Parts Manual EE 6501 10 3 3 Dimensions...
Страница 14: ...Installation Operation and Parts Manual EE 6501 14 Recessed mounting...
Страница 27: ...Installation Operation and Parts Manual EE 6501 27 Annex 1 Wiring diagrams and parts list...
Страница 28: ...Installation Operation and Parts Manual EE 6501 28...
Страница 33: ...Installation Operation and Parts Manual EE 6501 33 Pos CODE Name Specification Qty 1 330405001 Oil tank 10L 1...
Страница 37: ...Installation Operation and Parts Manual EE 6501 37...