
3660-MANUL-V01.01.00-CDC3 Operating Manual
Page 12 of 30
4.3
Main Screen Data Entry Requirements
4.3.1
Main Screen Overview
Some of the input fields are required and must be completed before data collection can begin. The
required fields are as follows:
•
Job Number
•
Licence Area
•
Feeder Number
•
Engineer Name
•
Substation ID
•
Feeder Number
•
Substation ID
•
Cable Type
•
RFCT Type
•
Voltage
•
Switch Position
•
Phase
Attempting to start recording data without completing the required fields will prompt 0.
Figure 20
Error message when starting a capture with incomplete information