background image

 

 

_______________________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           www.e2s.com              Tel: +44 (0)208 743 8880 

Document No. D234-00-201-IS_Issue_2         10-11-2022                         Sheet 1 of 4

 

                                                                    

INSTRUCTION MANUAL (WEATHER PROOF)  

WP7 PB/PM/PT CALL POINTS 

 

 

 
 
 

1)  Certification & Ratings

 

 
All  units  have  a  rating  label,  which  carries  the  following 
important information: - 

 

Model No.:

  

WP7-PB-S (Single Switch) 
WP7-PB-D (Dual Switch) 

 

WP7-PM-S (Single Switch) 
WP7-PM-D (Dual Switch) 
 
WP7-PT-S (Single Switch) 
WP7-PT-D (Dual Switch) 

 

 

 
 

UKCA Marking 

 
 

IP Rating:

   IP66/67 to EN/IEC60529 

 

Ambient Temperature Range:    

-55°C to +75°C 

 

 

2)  Location and Mounting

 

 
The  location  of  the  call  point  should  enable  ease  of  access 
for operation and testing. The unit should be mounted using 
the 4 off fixing holes which will accept up to M5 sized fixings. 
They  should  only  be  fixed  to  services  that  can  carry  the 
weight of the unit. 
To  gain  access  to  the  mounting  holes  in  the  base  the  front 
cover must be removed.  See Section 3. 

80,0 [3,15in.]

114,0 [4,49in.]

134,0 [5,28in.]

137,0 [5,39in.]

133,9 [5,27in.]

Ø6,4 [Ø0,25in.]

 

Fig. 1 View of base unit showing fixing centres (in mm). 
 
 
 

3)  Access to the Enclosure

 

 

 

 
To  access  the  chamber,  remove  the  four  off  M6  x  50 
stainless steel cap head cover bolts 
 
Once  the  screws  are  removed  the cover will hang down  out 
of the way to gain access to the terminals, the internal earth 
terminal and mounting hole recesses. 

 

 

 

 

 

 

 

 

 

 

Fig. 2 Accessing the Explosion proof Enclosure. 

 

Check that the earth bonding wire between the two castings 
is secure and the ‘O’ ring seal is in place.  
 

4)  Earthing 

 

The  units  are  provided  with  internal  and  external  earth 
terminals which are mounted in the base of the unit. 

 

Internal earthing connections should be made to the Internal 
Earth  terminal in  the  base of the housing using a  ring  crimp 
terminal to secure the earth conductor under the earth clamp. 
The  earth  conductor  should  be  at  least  equal  in  size  and 
rating to the incoming power conductors. 
When  using  the  internal  earth  terminal  ensure  that  the 
stainless steel M4 flat washer is between the incoming earth  
wire and the enclosure.   

Warning – High voltage may be present, 
risk of electric shock. DO NOT open 
when energised, disconnect power 
before opening. 

CE Marking
 

 

Call Point Cover   

Call Point Base 

M6x50 Cap head Cover Bolts - 4 off Positions 

Содержание WP7-PB-S

Страница 1: ...114 0 4 49in 134 0 5 28in 137 0 5 39in 133 9 5 27in 6 4 0 25in Fig 1 View of base unit showing fixing centres in mm 3 Access to the Enclosure To access the chamber remove the four off M6 x 50 stainles...

Страница 2: ...sum of the 2 off wires must be a maximum cross sectional area of 2 5mm Strip wires to 8mm Wires may also be fitted using ferrules Terminal screws need to be tightened down with a tightening torque of...

Страница 3: ...V EOL End of line device resistor ExxxR diode ED1 zener ExxxZ Microswitch 1 M S 1 Microswitch 2 M S 2 The unit can be wired with a maximum of 4 module devices Please refer to wiring schematic D234 06...

Страница 4: ...ocument No D234 00 201 IS_Issue_1 10 11 2022 Sheet 4 of 4 On PB the plunger will remain in the down position until the unit is reset This is done by pulling the plunger back up to the start position s...

Страница 5: ...ions of optional Series EOL Devices 1 2 3 4 5 6 M S 1 7 8 R 2B Circuit as shown in Unoperated condition Terminals 4 5 7 8 closed Terminals 4 5 6 open COM N O N C EOL SER NOTE These can be fitted eithe...

Страница 6: ...3 4 5 6 7 8 COM N O N C When fitting diodes or zener diodes polarity across devices must be observed Resistor polarity is unimportant Standard Unit showing possitions of optional Series EOL Devices N...

Страница 7: ...ESISTOR EOL DEVICE 1 EZ1 1 2 3 1 2 3 5A Circuit as shown in Unoperated condition Terminals 1 3 M S 1 and 4 6 M S 2 open Terminals 1 2 M S 1 and 4 5 M S 2 closed M S 1 M S 2 SERIES DEVICE 2 NONE DEFAUL...

Страница 8: ...lied EN 60947 1 2007 A2 2014 Directive 2011 65 EU Restriction of the use of certain hazardous substances in electrical and electronic equipment RoHS The product and all the components contained within...

Отзывы: