E2S STExB2X05-S Series Скачать руководство пользователя страница 9

 

E2S Warning Signals

      Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D199-00-621-IS

 

Issue 2

 

27-10-22

 

 

Sheet 9 of 15

 

 

The SIL 2 unit will also check for signal polarity. 
 
If a fault is found the SIL 2 unit will go into 

Fault mode

 
If power is disrupted the SIL 2 unit will go into 

Fault mode

, in 

fault mode the Power relay RLY1-1 will close whilst SIL 2 relay 
RLY1-2 will become an open circuit between terminals 1 & 2. 
 

 

Fault modes

 - The fault modes listed in sections 13-1 & 13-2 

will result in a change of state for relays RLY1-1 and RLY1-2. 
 
In fault mode the  Power relay RLY1-1 will close whilst SIL 2 
relay RLY1-2 will become open be circuit between terminals 1 
& 2. 

 

13-1 Beacon Failure 

 

 

Flash Failure 

 No flash detected. 

 

Beacon  Controller  Failure 

  No  flash  trigger  pulse 

detected. 

 

Flash Rate Failure 

 Regular 1 Hz flash cycle erratic. 

 

13-2 Power Failure / SIL 2 Failure 

 

 

SIL  2  Controller  Failure 

  Internal  function  and 

system checking flags fault. 

 

Rapid  Power  Cycling 

  System  indicates  power 

instability. 

 

Total Power Failure.  

 
It is possible to reset these faults if they were transitory. 
 
Resetting Failure (by power cycling) - It is possible that the SIL 
2 unit can be reset by powering the unit off for a period greater 
than 20 seconds.  On  restarting  the unit  and  running  through 
the commissioning cycle the fault may clear. 
 
Resetting Failure (by Hard Reset) - It is possible that the SIL 2 
unit  can  be  reset  by  hard  resetting  the  unit  using  the  reset 
jumper within the unit (see section 15-4) on hard resetting. On 
restarting  the  unit  and  running  through  the  commissioning 
cycle, the fault may clear. It is necessary to run the test function 
cycle again to see if the fault is still evident. 
 
If the hard reset process does not correct the latched fault the 
alarm horn sounder may require further investigation, please 
contact your local E2S representative. 
 
 
 
 
 
 
 
 
 
 
 
 

Commissioning  System  -  Functional  start-up  of  System 
(Normally in reverse polarity mode) 

 
When Commissioning system the power must not be disrupted 

to the SIL 2 Unit within the unit’s 

initialization cycle which is 

seconds

 
Once past this period the SIL 2 system is fully operational and 
will be in monitoring the beacon and power in Standby mode. 
 
The relay RLY1-2 on the SIL 2 unit will only remain open for a 
maximum of 1 second on commissioning start-up. RLY1-2 will 
subsequently  close  contacts  1  &  2  indicating  healthy 
operation. Contact 1 & 2 will only remain open in the event of 
a fault or a loss of power. 
 

System Testing (Active Mode normal polarity) 
 

The SIL 2 system will remain monitoring the power in standby 
mode until the polarity is changed to normal mode to enable 
an active system for beacon functional testing. 
 

Important

:  -  The  polarity  must  be  held  in  active  mode  for  a 

period in excess of 

15 seconds

 to ensure a full system check 

is performed. 
 
Once  the  test  period  has  been  completed  the  unit  can  be 
switched back to standby mode by reversing the polarity. 
 
If  no  faults  have  been  found  during  the  test  the  relays  will 
remain in steady state. 
 
The SIL 2 unit will continue to monitor the power and module 
function. 
 

Important

: - The automated test cycle 

must

 be undertaken on 

at least a weekly basis to maintain the SIL 2 units reliability. 
 

System Activation (Active Mode normal polarity) 

 
The SIL 2 system will remain monitoring the power in standby 
mode until the polarity is changed to Active mode to enable an 
active  system  for  beacon  to  function  as  a  warning  signaling 
device. 
 

Important

  :-  The  polarity  must  be  held  in  active  mode  for  a 

period in excess of 15 seconds to ensure a full system check 
is performed whilst in alarm mode, although it is expected that 
during  a  system  activation  this  period  will  be  significantly 
greater. 
 

Note

 :- The fault indication signal on TB1 can take up to 1.5 

seconds to indicate system fault.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

Содержание STExB2X05-S Series

Страница 1: ...g the maximum current required for all beacons Review associated cable size length and quantity of beacons on each circuit Standard Model Number Nom Voltage Voltage Range Nom Operating Current Max Cur...

Страница 2: ...uipment Group and Category II 2G II 2D CE Marking and Notified Body No 2813 UKCA Marking and Notified Body No 0518 3 2 NEC CEC Ratings All models are approved for use as Visual Signal Device for use a...

Страница 3: ...Ex UKEx STExB2X05DC up to 55 C ambient NEC CEC Up to 65 C ambient Dust Groupings ATEX IECEx UKEx only Group IIIA Combustible Flyings Group IIIB Non conductive Dust Group IIIC Conductive Dust Maximum S...

Страница 4: ...0 2 IEC60079 10 2 Explosive atmospheres Classification of areas Explosive dust atmospheres The installation of the units must also be in accordance with any local codes that may apply and should only...

Страница 5: ...e entry temperature may exceed 60 C or the cable branching point temperature may exceed 60 C and therefore suitable heat resisting cables and cable glands must be used with a rated service temperature...

Страница 6: ...PCBA See Fig 6 For SIL 2 operation only the 1Hz Flash rate is approved Figure 6 DIP Switch Location Switch Setting S1 Mode SIL Approved 00 1Hz 60FPM Yes 01 1 33Hz 80FPM No 10 1 5Hz 90FPM No 11 Double...

Страница 7: ...epair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards ATEX IECEx UKEx Requirements Only EN60079 19 IEC60079 1...

Страница 8: ...and Active mode Health status of power supply Beacons correct function and flash pattern The SIL 2 beacon operates as part of a SIL 2 system The beacon will after commissioning remain powered in Stan...

Страница 9: ...equire further investigation please contact your local E2S representative Commissioning System Functional start up of System Normally in reverse polarity mode When Commissioning system the power must...

Страница 10: ...h it is highly recommended that the unit is wired as stated in section 15 1 as a 4 Wire System J1 Header Current Sense Resistor CSR Shown in factory default position A see section 15 3 places TB1 Curr...

Страница 11: ...he circuit Note a cable short circuit will not be detectable in this configuration For one unit only Beacon power supply terminal block Current drawn mA Active Mode 190mA Standby Mode 25mA SIL2 TB1 Cu...

Страница 12: ...multiple SIL 2 alarm horn sounders are to be cabled in series the monitoring connections differ from that of a single beacon For more information see manual D197 00 621 IS available from the E2S webs...

Страница 13: ...tion B pins 2 3 linked Places power supply terminal Fault Resistor RLY 1 2 in circuit As used in 2 Wire Configuration Figure 16 J2 Header pin positions Fault Resistor FR 15 4 SIL 2 Hard Reset Function...

Страница 14: ...dom Hardware Failures and Architectural constraints route 1H 2 As an unvoted item i e hardware fault tolerance of 0 at SIL 2 The product was assessed against failure modes Failure respond to an input...

Страница 15: ...pecified when ordering The values of resistors available are shown in table 6 below Code Resistor Value Default resistor coding is as follows STExB2X05DC024AS1S1R A AFZ Example of a custom requirement...

Страница 16: ...ATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D191 06 621 M ABALOS B ISARD R N POTTS OF NTS 1 1 23 09 2...

Страница 17: ...Netherlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 Gb II 2D Ex tb IIIC T...

Страница 18: ...e and Place of Issue London 03 12 2021 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Страница 19: ...0518 Rake Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 Gb II 2D Ex tb IIIC T85 C T137 C Db IP6...

Страница 20: ...nd Place of Issue London 24 02 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the ma...

Отзывы: