background image

 

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D157-00-101-IS

 

Issue 1

 

02-11-21

 

 

Sheet 3 of 7

 

 

 

Figure 2: Fixing Location for GNExS2F Sounder. 

 

 

Figure 3: Fixing Location for GNExS2H Sounder. 

 

On  completion  of  the  installation  the  two  large  bracket 
adjustment  screws  on  the  side  of  the  unit  must  be  fully 
tightened to ensure that the unit cannot move in service. 
 
The  enclosure  provides  IP66  protection  and  is  suitable  for 
installation in exterior locations providing it is positioned so that 
water cannot collect in the horn, and the cable entry is sealed.  
 

6.2. Access to the Flameproof Enclosure 

 

 

Warning 

 Hot surfaces. External 

surfaces and internal components 
may be hot after operation, take 
care when handling the equipment. 

 
In order to connect the electrical supply cables to the sounder 
it is necessary to remove the flameproof cover to gain access 
to the flameproof chamber. To achieve by loosening the M3 
Grub Screw within the flameproof cover, and then unscrew 
the flameproof cover, taking extreme care not to damage the 
flameproof joints in the process (see figure 4).  
 

 

Figure 4: Accessing the Explosion Proof Enclosure. 

 

On completion of the cable wiring installation the flameproof 
joints should be inspected to ensure that they are clean and 
that they have not been damaged during installation. 
 
Ensure 

that the ‘O’ ring seal is in place

 and undamaged. 

 
When  fitting  the  flameproof  cover  ensure  the  thread  is 
engaged correctly. Fully tighten the cover all the way, ensure 
no gap is visible between the cover and base of the sounder 
enclosure. Tighten the M3 grub screw. 
 

7)  Installation Requirements 

 

7.1. Installation Standards Compliance 

 

 

Warning 

 High voltage may be 

present, risk of electric shock. 
DO NOT open when energised, 
disconnect power before opening. 

 
The  sounder  must  only  be  installed  by  suitably  qualified 
personnel in accordance with the latest issues of the relevant 
standards. 
 
ATEX / IECEx installation standards: 
 

EN60079-14:2008  /  IEC60079-14:2007  (Ed4):  Electrical 
Installations in Hazardous Areas (other than mines). 
 
EN60079-10-1:2009 

IEC60079-10:2008 

(Ed1): 

Classification of Areas, Gas Atmosphere 

 
The installation of  the units must also be in accordance  with 
any local codes that may apply and should only be carried out 
by  a  competent  electrical  engineer  who  has  the  necessary 
training. 
 

7.2. Cable Selection and Connections 

 
When selecting the cable size, consideration must be given to 
the input current that each unit draws (see table 1), the number 
of sounders on the line and the length of the cable runs. The 
cable  size  selected  must  have  the  necessary  capacity  to 
provide the input current to all the sounders connected to the 
line.  
 
Electrical connections are to be made into the terminal blocks 
on the PCBA located in the flameproof enclosure using solid 
wire  0.5-4mm²  /  AWG  20-12  or  stranded  wire,  sizes  0.5-
2.5mm²  /  AWG  24-14.  Wire  insulation  needs  to  be  stripped 
8mm. Wires may be fitted securely with crimped ferrules. 
 

 

Figure 5: Wire Preparation. 

 
Terminal screws need to be tightened down with a tightening 
torque  of  0.45  Nm  /  5  Lb-in.  An  8-way  terminal  block  is 
provided  on  the  AC  Sounder,  and  a  6-way  terminal  block  is 
provided on the DC Sounder. 
 

Содержание GNExS2F

Страница 1: ...282mA 138mA 325mA 120 115 123 118 230ac 78mA 167mA GNExS2HDC024 12Vdc 10 30Vdc 289mA 356mA 324mA 740mA 124 119 127 122 24Vdc 324mA 740mA GNExS2HDC048 48Vdc 38 60Vdc 195mA 391mA 324mA 740mA 124 119 12...

Страница 2: ...ts can be installed in locations with the following conditions Area Classification Zone 1 Explosive gas air mixture likely to occur in normal operation Zone 2 Explosive gas air mixture not likely to o...

Страница 3: ...en the cover all the way ensure no gap is visible between the cover and base of the sounder enclosure Tighten the M3 grub screw 7 Installation Requirements 7 1 Installation Standards Compliance Warnin...

Страница 4: ...the cable branching point temperatures may exceed 70 C at entry point 80 C at branching point Therefore suitable heat resisting cables and cable glands must be used with a rated service temperature a...

Страница 5: ...witching DC Only NOTE Max supply is 33V DC if higher DC voltage is required use Negative switching Figure 9 Stage Switching Polarity 8 3 Tone Selection The ExS Alarm Horn Sounders have 64 different to...

Страница 6: ...06 005 for AC schematic diagrams 7a AC Single Stage Configuration Default 7b AC Three Four Stage Configuration Default 8 AC Two Stage Voltage Free Activation Configuration Custom K Table 3 Summary of...

Страница 7: ...ant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and maintenance F...

Страница 8: ...NE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W MIN OR 1K MIN 0 5W MIN 28V MAX SYSTEM 470 MIN 2W MIN OR 2 4K MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT...

Страница 9: ...ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W...

Страница 10: ...ge 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage 2 Cconnec...

Страница 11: ...RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2 Common N N L L E N N...

Страница 12: ...0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1...

Страница 13: ...y No 2813 CSA Group Netherlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIB or IIC T...

Страница 14: ...te and Place of Issue London 23 12 2020 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the...

Отзывы: