background image

 

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D157-00-001-IS

 

Issue 7

 

02-11-21

 

 

Sheet 4 of 7

 

 

When connecting wires to the terminals great care should be 
taken to dress the wires so that when the cover is inserted into 
the  chamber  the  wires  do  not  exert  excess  pressure  on  the 
terminal  blocks.  This  is  particularly  important  when  using 
cables with large cross-sectional areas such as 2.5mm². 
 

Earthing 

 
Both AC and DC sounder units must be connected to an earth 
according  to  EN/IEC  60079/14.  The  units  are  provided  with 
internal and external earth terminals which are both located on 
the terminal chamber section of the unit (see figure 5). 

 

Internal  earthing  connections  should  be  made  to  the  PCB 
terminal block or to the Internal Earth Stud of the housing using 
a  ring  crimp  terminal  to secure  the  earth  conductor  between 
the two M4 stainless steel flat washers. The earth conductor 
should  be  at  least  equal  in  size  and  rating  to  the  incoming 
power conductors. 
 
External earthing connections should be made to the M5 earth 
stud, using a ring crimp terminal to secure the earth conductor 
to  the  earth  stud  between  the  two  M5  stainless  steel  flat 
washers, then reassemble the M5 spring washer and tighten 
the  M5  nut  to  ensure  that  the  cable  lug  is  secured  against 
loosening and twisting. The external earth conductor should be 
at least 4mm

2

 in size. 

 

7.3. Cable Glands, Blanking Elements & Adapters 

 
For  high  ambient  temperatures  the  cable  entry  or  the  cable 
branching point temperatures may exceed: 
 

  70ºC at entry point. 

  80ºC at branching point. 

 

Therefore,  suitable  heat  resisting  cables  and  cable  glands 
must  be  used,  with  a  rated  service  temperature  at  least  as 
stated in the table below: 

 

Max Ambient Temperature (ºC)

 

Model 

40 

45 

50 

55 

60 

65 

70 

GNExS1 

 

70 

75 

80 

85 

90 

95 

Table 2: Min. Ratings of Cables & Cable Glands. 

 

Cable Glands 

 
Appropriate cable glands to be customer supplied. 
 
The cable entries have an M20 x 1.5 

 6H entry thread. Only 

suitably rated and ATEX / IECEx certified cable glands must 
be  used.  They  must  be  suitable  for  the  type  of  cable  being 
used and also meet the requirements of the current installation 
standards EN 60079-14 / IEC60079-14. 
 

Blanking Plugs 
 

When only one cable entry is used the other entries must be 
closed with suitably rated and  certified blanking plugs as per 
type of approval. 
 
Any unused cable entries must be closed with suitably rated 
and ATEX / IECEx certified blanking plugs. 
 

Ingress Protection 

 
If  a  high  IP  (Ingress  Protection)  rating  is  required,  then  a 
suitable sealing washer must be fitted under the cable glands 
or blanking plugs. A minimum ingress protection rating of IP6X 

must  be  maintained  for  installations  in  explosive  dust 
atmospheres. 
 

Adapters 

 
The GNEx sounder range can be supplied with the following 
types of adapters: 

 

M20 to ½” NPT

 

M20 to ¾” NPT

 

M20 to M25 

 

It is important to note that stopping plugs cannot be fitted onto 
adapters, only directly onto the M20 entries. 

 
 

Any  other  adapters  used  must  be  suitably  rated  and  ATEX / 
IECEx certified adapters. 
 
If the installation is made using conduit, openings must have a 
sealing fitting connected as close as practical to the wall of the 
enclosure, but in no case more than the size of the conduit or 
50mm, whichever is the lesser. 
 

8)  Settings 

 
Following illustrations show the settings available for GNExS1 
Alarm Horn Sounders. See schematic diagrams D190-06-001 
for DC units and D190-06-005 for AC units. 
 

8.1. SPL Configuration 

 
See  Table  1  for  product  power  supply  and  Sound  Pressure 
Levels (SPL). 
 

Configuration for DC Units 

 

 

Figure 6: DC PCBA SPL Configuration.

 

 

Configuration for AC Units 

 

 

Figure 7: AC PCBA SPL Configuration.

 

 
 

Содержание GNExS1F Series

Страница 1: ...50 60Hz 73mA 80mA 110 105 230Vac 48mA GNExS1FDC024 12Vdc 10 30Vdc 221mA 221mA 115 110 24Vdc 185mA GNExS1FDC048 48Vdc 38 60Vdc 115mA 221mA 115 110 GNExS1FAC230 115Vac 100 260Vac 50 60Hz 73mA 80mA 115...

Страница 2: ...lassification The units can be installed in locations with the following conditions Area Classification Zone 1 Explosive gas air mixture likely to occur in normal operation Zone 2 Explosive gas air mi...

Страница 3: ...ble between the cover and base of the sounder enclosure Tighten the M3 grub screw 7 Installation Requirements 7 1 Installation Standards Compliance Warning High voltage may be present risk of electric...

Страница 4: ...ed in the table below Max Ambient Temperature C Model 40 45 50 55 60 65 70 GNExS1 70 75 80 85 90 95 Table 2 Min Ratings of Cables Cable Glands Cable Glands Appropriate cable glands to be customer supp...

Страница 5: ...t tones that can be selected independently for the first and second stage alarms The tones are selected by operation of the tone setting DIP switch 1 DIP 2witch 2 see figures 6 and 7 on the PCB for st...

Страница 6: ...06 005 for AC schematic diagrams 7a AC Single Stage Configuration Default 7b AC Three Four Stage Configuration Default 8 AC Two Stage Voltage Free Activation Configuration Custom K Table 3 Summary of...

Страница 7: ...ant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and maintenance F...

Страница 8: ...NE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W MIN OR 1K MIN 0 5W MIN 28V MAX SYSTEM 470 MIN 2W MIN OR 2 4K MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT...

Страница 9: ...ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W...

Страница 10: ...ge 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage 2 Cconnec...

Страница 11: ...RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2 Common N N L L E N N...

Страница 12: ...0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1...

Страница 13: ...y No 2813 CSA Group Netherlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIB or IIC T...

Страница 14: ...te and Place of Issue London 23 12 2020 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the...

Отзывы:

Похожие инструкции для GNExS1F Series