screws,  spring  and plain  washers in  the order  shown  above 
and tighten down. 
 

7)  Selection of Cable, Cable Glands, Blanking 

Elements & Adapters 

 

When  selecting  the  cable  size,  consideration  must  be  given 
to  the  input  current  that  each  unit  draws  (see  Table  1),  the 
number  of  sounders  on  the  line  and  the  length  of  the  cable 
runs.  The  cable  size  selected  must  have  the  necessary 
capacity  to  provide  the  input  current  to  all  of  the  sounders 
connected to the line.  

 

The  dual  entries  can  be  ordered  with  one  of  the  following 
options: 
 
2-off M20 x 1.5 thread 
2-off ½” NPT thread 
1-off M20 x 1.5 & 1-off ½” NPT thread 
 
To  maintain  the  ingress  protection  rating  and  mode  of 
protection, the cable entries must be fitted with suitably rated, 
certified  cable  entry  and/or  blanking  devices  during 
installation.  
 
For  ambient  temperatures  over  +40ºC  the  cable  entry 
temperature  may  exceed  +70ºC  or  the  cable  branching 
temperature  may  exceed  +80ºC.  Therefore  suitable  heat 
resisting cables and cable glands must be used as per table 
below 
 

Ambient Temp. 

40ºC 

45ºC 

50ºC 

55ºC 

Min. Rating of cables 
and cable glands 

90ºC 

95ºC 

100ºC  105ºC 

 

If  a  high  IP  (Ingress  Protection)  rating  is  required  then  a 
suitable sealing washer must be fitted under the cable glands 
or blanking plugs.  

 

For  use  in  explosive  dust  atmospheres,  a  minimum  ingress 
protection rating of IP6X must be maintained. 
 
For  use  in  explosive  gas  atmospheres,  a  minimum  ingress 
protection rating of IP54 must be maintained. 

 

8)  Cable Connections 

 

Electrical connections are to be made into the terminal blocks 
on  the  PCBA  located  in the  enclosure. See section 5  of  this 
manual for access to the enclosure.  

 

Wires  having  a  cross  sectional  area  between  0.5  mm²  to 
2.5mm²  can  be  connected  to  each  terminal  way.  If  an  input 
and  output  wire  is  required  the  2-off  Live/Neutral  or  +/- 
terminals  can  be  used.  If  fitting  2-off  wires  to  one  terminal 
way  the  sum  of  the  2-off  wires  must  be  a  maximum  cross 
sectional area of 2.5mm². Strip wires to 8mm. Wires may also 
be fitted using ferrules. Terminal screws need to be tightened 
down  with  a  tightening  torque  of  0.45  Nm  /  5  Lb-in.  When 
connecting wires to the terminals great care should be taken 
to dress the wires so that when the cover is inserted into the 
chamber  the  wires  do  not  exert  excess  pressure  on  the 
terminal  blocks.  This  is  particularly  important  when  using 
cables with large cross sectional areas such as 2.5mm². 
 
 
 
 

9)  AC Wiring 

 

A  6-way  terminal  block  is  provided  on  the  AC  Sounder  for 
power.  There  are  2-off  Live,  2-off  Neutral  and  2-off  Earth 
terminals  in  total.  A  3-way  terminal  is  provided  for  stage 
switching with a stage 2, a stage 3 and a common terminal.  

 

 

 

 

Fig. 4 AC Terminals 

 
Refer  to  schematic  document  D209-06-001  for  further  detail 
on stage switching and terminal connections. 

 

10) DC Wiring 

 

A  10-way  terminal  block  is  provided  on  the  DC  Sounder. 
There are 2-off +ve, 2-off -ve, 2-off stage 2, 2-off stage 3 and 
2-off Earth terminals in total.  
 
 
 

 

 

Fig. 6 DC Terminals 

 
For further detail, refer to schematic document D209-06-001.  

 
10.1 

Line Monitoring 

 

On E2xS1 DC units, DC reverse line monitoring can be used 
if  required.  All  DC  sounders  have  a  blocking  diode  fitted  in 
their supply input lines. An end of line monitoring resistor can 
be connected across the +ve and –ve terminals. If an end of 
line resistor is used it must have the following values: 
 

 

Min. Resistance 

Min. Power 

24V DC 

3.9KΩ 

0.5W 

1KΩ 

2W 

48V DC 

15KΩ 

0.5W 

3.9KΩ 

2W 

48V DC 
Volume 
Control 

DIP Switch 

DIP Switch 

Volume Control 

S3 

 

S2 

 

 

N  

S3
S2


E

 

24V DC 
Volume 
Control 

Содержание E2xS1R

Страница 1: ...ON HUMIDE HAUT TENSION RISK DE CHOC ATTENDEZ 5 MINUTES APRES AVOIR DEBRANCHE L ALIMENTATION AVANT D OUVRIR LA BOITIER 3 Rating Marking Information 3 1 ATEX IECEx UKEx certification The E2xS1 alarm hor...

Страница 2: ...l Electric Code CEC Class Zone ratings Canada Standards CAN CSA C22 2 No 60079 0 Ed 4 02 2019 Explosive Atmospheres Part 0 Equipment General Requirements CAN CSA C22 2 No 60079 7 Ed 2 Explosive Atmosp...

Страница 3: ...d certified cable entry and or blanking devices during installation Equipment with the flare horn shall not be installed with the flare higher than horizontal to avoid accumulation of dust The equipme...

Страница 4: ...nclosure See section 5 of this manual for access to the enclosure Wires having a cross sectional area between 0 5 mm to 2 5mm can be connected to each terminal way If an input and output wire is requi...

Страница 5: ...1 0 0 1 544Hz 100mS 440Hz 400mS NF S 32 001 40 Tone 17 Tone 23 0 1 1 0 0 1 800Hz 0 25 sec on 1 sec off Intermittent 39 Tone 45 Tone 34 1 0 1 0 0 1 2000Hz Continuous 38 Tone 45 Tone 9 0 0 1 0 0 1 1000...

Страница 6: ...IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D209 06 001 R S RAIT R N POTTS R N POTTS 05 08 2020 OF E2xS1R E2xS1F E2xS2F SOUNDER WIRING DIAGRAMS INTRODUCTION RSR 05 08 2020 NT...

Страница 7: ...Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 3G Ex ec IIC T4 T3 T2 Gc II 3D Ex tc IIIC 85 C 120 C Dc IP6X Dust Protection to EN60079 0 EN60079 31 Standar...

Страница 8: ...e and Place of Issue London 22 08 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Страница 9: ...on Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 3G Ex ec IIC T4 T3 T2 Gc II 3D Ex tc IIIC 85 C 120 C Dc IP6X Dust Protection to EN60079 0 EN60079 31 Standards applied EN IEC 6007...

Страница 10: ...Place of Issue London 22 08 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the marke...

Отзывы: