E2S D2xC1 Скачать руководство пользователя страница 5

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D189-00-501-IS

 

Issue 11

 

20-08-22

 

 

Sheet 5 of 8

 

 

Stage three (S3) operation: Power L and N, link the common 
(C) and S3 terminals. 
 
Stage  four  (S4)  operation:  Power  L  and  N,  link  the  common 
(C) and both the S2 and S3 terminals.  
 
Strobe  will  continue  to  flash  during  alarm  horn  S2,  S3  &  S4 
stages. 

 

 

 

Fig. 5 AC Terminals 

 

11)  DC Wiring  

 

11.1 DC Stage Polarity Control 

 

The  stage  switches  of  the  DC  powered  D2x  units  can  be 
activated  via  Positive  (+ve)  or  Negative  (-ve)  switching.  All 
units  are  factory  set  to  -ve  switching  as  standard.  If  +ve 
switching  is  required,  the  two  wire  links  should  be  removed 
from the ‘-’ positions of the stage polarity control terminals and 
fitted to the ‘+‘ positions as shown in fig 6. 

 

Fig. 6 Stage Polarity Control settings.

 

 

11.2 Units First Stage Tones 

 

Stage one (S1) operation: Simply connect the supply voltage 
to  the  +  and  -  supply  terminals,  (see  fig.  8).  The  Strobe  is 
powered  via  factory  installed  wires  connected  to  the  alarm 
horn. The wires connecting the alarm horn and strobe can be 
removed if the user wishes to power the strobe separately. 
 

11.3 Second, Third and Fourth Stage Tone Selection 

For units set up for –ve switching (default setting): 

 
Stage two (S2) operation: Power +ve and –ve, link a -ve supply 
line to the S2 terminal. 
 
Stage  three  (S3)  operation:  Power  +ve  and  –ve,  link  a  -ve 
supply line to the S3 terminal. 
 
Stage four (S4) operation: Power +ve and –ve, link a -ve supply 
line to both the S2 & S3 terminals. 
 
Strobe  will  continue  to  flash  during  alarm  horn  S2,  S3  &  S4 
stages. 
 

For units set up for +ve switching (refer to 9.1): 

 
Stage two (S2) operation: Power +ve and –ve, link a +ve supply 
line to the S2 terminal. 
 
Stage  three  (S3)  operation:  Power  +ve  and  –ve,  link  a  +ve 
supply line to the S3 terminal. 
 
Stage four (S4) operation: Power +ve and –ve, link a +ve supply 
line to both the S2 & S3 terminals. 
 
Strobe  will  continue  to  flash  during  alarm  horn  S2,  S3  &  S4 
stages.

AC Strobe terminals 

AC Alarm Horn terminals 

Wire Links in ‘-‘ positions 
for –ve switching

 

Wire Links in ‘+‘ positions 
for +ve switching

 

Содержание D2xC1

Страница 1: ...WARNING EXPLOSION HAZARD SUBSTITUTION OF ANY COMPONENT MAY IMPAIR SUITABILITY FOR CLASS I DIVISION 2 WARNING EXPLOSION HAZARD SUBSTITUTION OF ANY COMPONENTS MAY IMPAIR SUITABILITY FOR CLASS II DIVISI...

Страница 2: ...Class I Div 2 Class I Div 2 Class II Div 2 Class III Div 1 2 ABCD T2B ABCD T2C ABCD T2D FG T5 Ta 40 C to 70 C Ta 40 C to 55 C Ta 40 C to 40 C Ta 40 C to 50 C Ta 40 C to 50 C D2XC1 X10 Class I Div 2 Cl...

Страница 3: ...en assessed as a safety related device as referred to by Directive 2014 34 EU Annex II clause 1 5 The cable entry temperature may exceed 70 C the cable branching point may exceed 80 C Therefore suitab...

Страница 4: ...Fig 2 e Adjust the internal volume control to provide the required sound level f Check that the O ring seal in the front cover is in good condition and not damaged g Replace the front of the unit and...

Страница 5: ...supply terminals see fig 8 The Strobe is powered via factory installed wires connected to the alarm horn The wires connecting the alarm horn and strobe can be removed if the user wishes to power the s...

Страница 6: ...t least 4mm2 in size The external earth crimp ring should be located between the two M5 plain washers provided and securely locked down with the M5 spring washer and M5 nut 13 End Of Line Monitoring D...

Страница 7: ...5s off x3 1s gap ISO 8201 Temporal Pattern 1 1 0 1 0 0 44 1 8 13 422 775Hz 0 85 on 0 5 off x3 1s gap NFPA Temporal Coded 0 0 1 1 0 0 44 1 8 14 1000 2000Hz 1Hz Singapore 1 0 1 1 0 0 23 3 35 15 300Hz Co...

Страница 8: ...3Hz Sweeping 1 0 0 0 1 1 44 24 12 51 600 1250Hz 0 125Hz Sweeping 0 1 0 0 1 1 44 24 12 52 660 1200Hz 1Hz Sweeping 1 1 0 0 1 1 64 24 12 53 800 1000Hz 1Hz Sweeping 0 0 1 0 1 1 56 24 12 54 800 1000Hz 7Hz...

Страница 9: ...UL1638 UL464 and produce a sound pressure level above 75dB A at 10 feet D2xC1X05DC024 D2xC1X10DC024 For Fire Alarm applications the Sounder Volume must be at the highest setting see volume control sec...

Страница 10: ...DH 20 05 2019 NTS 1 1 A E E ve IN ve OUT ve IN ve OUT EARTH IN EARTH OUT DC D2XC1X05 X10 UNITS Line Monitoring Stage 1 Apply power to Sounder ve ve Stage 2 Apply power to Sounder ve ve Connect Stage...

Страница 11: ...herlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 3G Ex ec IIC T6 T4 T3 T2 T1 Gc II 3D Ex tc I...

Страница 12: ...e and Place of Issue London 22 08 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Страница 13: ...Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 3G Ex ec IIC T6 T4 T3 T2 T1 Gc II 3D Ex tc IIIC Ex tc IIIC T55 75 80...

Страница 14: ...Place of Issue London 22 08 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the marke...

Отзывы: