background image

 

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D190-00-001-IS

 

Issue 2

 

17-03-2022

 

 

Sheet 4 of 8

 

 

7.4  Access to the Explosionproof Enclosure 
  

 

Fig 2: Accessing the enclosure

 

 
To  access the  Ex  d  chamber,  loosen  the  M4  grub  screw  on  the 
sounder cover. Open the enclosure by turning the  sounder cover 
counterclockwise  and  remove the  cover.  Take  extreme  care  not 
to damage the explosionproof threads in the process. 
 
On completion of the installation the flameproof threaded joint should 
be inspected to ensure that they are clean and that they have not 
been damaged during installation.  
 
Ensure the O-ring seal is in place and undamaged. 
 
When fitting the flameproof cover ensure the thread is engaged 
correctly. Fully tighten the cover all the way, ensure no gap is visible 
between the cover and base of the sounder enclosure. 
 

8)  Installation Requirements 

 

8.1 

Safe Installation Requirements 

  

 

Warning 

– High voltage may be present, 

risk of electric shock. 
DO NOT open when energised, 
disconnect power before opening. 

The sounder must only be installed by suitably qualified personnel in 
accordance with the latest issues of the relevant standards. 

 

The product must only be installed by suitably qualified personnel 
in accordance with the latest issues of the relevant standards. 
  
The installation of the units must also be in accordance with the 
NEC / CEC and any local regulations and should only be carried 
out  by  a  competent  electrical  engineer  who  has  the  necessary 
training. 
  

8.2  Cable Selection and Connections 

 
Electrical connections are to be made into the terminal blocks on the 
PCBA, using solid wire 0.5-4mm2 / AWG 20-12 or stranded wire, 
sizes 0.5-2.5mm2 / AWG 24-14. Wire insulation needs to be stripped 
8mm. Wires may be fitted securely with crimped ferrules. Terminal 
screws need to be tightened down with a tightening torque of 0.45 
Nm / 3.5 Lb-in. 
 
When selecting the cable size, consideration must be given to the input 
current that each unit draws (see table 1), the number of sounders on 
the line and the length of the cable runs. The cable size selected must 
have  the  necessary  capacity  to  provide  the  input  current  to  all  the 
sounders connected to the line.  
 

 

AC: 1.0 - 2.5mm

2

 / AWG18 - AWG12 

DC: 0.2 - 2.5mm

2

 / AWG24 - AWG12 

 

Fig 3: Wire Preparation.  

 
When connecting wires to the terminals great care should be taken to 
dress the  wires so  that  when  the cover is  inserted  into the  chamber 
the wires do not exert excess pressure on the terminal blocks. This is 
particularly  important  when  using  cables  with  large  cross-sectional 
areas such as 2.5mm². 

8.3  Earthing 

 

 

Fig. 4 Earth Locations 

 
The unit has both a primary internal and secondary external earth 
fixing point. 
  
Internal  earth  connections  should  be  made  to  the  internal  Earth 
terminal in the base of the housing using a ring crimp terminal to 
secure  the  earth  conductor  under  the  earth  clamp.  The  earth 
conductor  should  be  at  least  equal  in  size  and  rating  to  the 
incoming power conductors but at least a minimum of 0.82mm

2

 / 

18AWG in size. 
 
External earth connections can be made to the M5 earth stud (see 
Fig. 4), using a ring crimp terminal to secure the earth conductor 
to the earth stud. The external earth conductor should be at least 
4mm

2

 in size. 

  
The external earth crimp ring should be located  between the two 
M5 plain washers provided and securely locked down with the M5 
spring washer and M5 nut. 
 

8.4 

Cable Glands, Blanking Elements & Adapters 

 
Ingress Protection 

 
If a high IP (Ingress Protection) rating is required then a suitable 
sealing washer must be fitted under the cable glands or blanking 
plugs.  A  minimum  ingress  protection  rating  of  IP6X  must  be 
maintained for installations in explosive dust atmospheres. 
 
To maintain the ingress protection rating and mode of protection, 
the  cable  entries  must  be  fitted  with  suitably  rated  cable  entry 
and/or blanking devices during installation. 
  
If entries are fitted with adaptors they must be suitably rated for 
the application. Fitting of blanking elements into adaptors is not 
permitted. 
 

Adapters 

 
The  D1x  sounder  range  can  be  supplied  with  the  following  types  of 
adapters: 
 

M20 to ½” NPT 
M20 to ¾” NPT 
M20 to M25 

 
It  is  important  to  note  that  stopping  plugs  cannot  be  fitted  onto 
adapters, only directly onto the M20 entries. 
 
 
 
 
 
 
 
 
 
 
 

 

Internal Earth 
Marked with G 

External Earth 

  

  

8mm 

Содержание D1xS1 Series

Страница 1: ...EEP TIGHTLY CLOSED WHEN IN OPERATION WARNING FIT SEALING FITTING IN CONDUIT RUNS WITHIN 18 INCHES FROM ENCLOSURE EQUIPMENT MUST NOT BE INSTALLED WITH THE HORN FACING UPWARDS OF HORIZONTAL DO NOT OPEN...

Страница 2: ...o 75 C Ex db IIC T6 Gb Ta 55 C to 70 C Ex tb IIIC T82 C Db Ta 55 C to 75 C See Product table for electrical ratings of each unit model Certificate No DEMKO 19ATEX2141X IECEx ULD 19 0008X UKEx UL UL21U...

Страница 3: ...ected to external conditions that might cause a build up of electrostatic charges on non conducting surfaces Only the explosionproof cover is to be used for access to the enclosure for installation se...

Страница 4: ...and the length of the cable runs The cable size selected must have the necessary capacity to provide the input current to all the sounders connected to the line AC 1 0 2 5mm2 AWG18 AWG12 DC 0 2 2 5mm...

Страница 5: ...n Sounders See schematic diagram D190 06 001 for details 9 1 Configuration See Table 1 for product power supply and Sound Pressure Levels SPL Configuration for DC Units Fig 5 DC PCBA Configuration for...

Страница 6: ...iring options Config Voltage Configuration Description Features Product Option Identifier 1a DC Single Stage Configuration Line monitoring Positive Switching 1 1b DC Two Stage Configuration Common Neg...

Страница 7: ...f Line Monitoring An optional 12 way terminal module is available to enable up to four alarm stages to be activated from three DC voltage output channels The three alarm stage activation inputs can be...

Страница 8: ...Only End of Line Devices may be fitted between the ve ve terminals of the PCBA Please ensure that the device legs meet the wire size range stated for the connection terminals and are fitted correctly...

Страница 9: ...0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1...

Страница 10: ...US 100 2dB A CA 108 5dB A P3 US 103 5dB A CA 111 6dB A at 10 feet 24Vdc For Fire Alarm applications the Sounder Volume must be at the highest setting see volume control section For fire alarm use Ton...

Страница 11: ...al Axis 3dB A 39 41 38 41 6dB A 45 47 64 69 D1xS2FDC024 A D1xS2FDC024 S Sounder Directional Characteristics for Canadian Fire CAN ULC S525 P3 OSPL Horizontal Axis Vertical Axis 3dB A 46 48 46 47 6dB A...

Страница 12: ...INE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W MIN OR 1K MIN 0 5W MIN 28V MAX SYSTEM 470 MIN 2W MIN OR 2 4K MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT...

Страница 13: ...n ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2...

Страница 14: ...er to Stage 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage...

Страница 15: ...5 R S RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2 Common N N L L E...

Страница 16: ...warden Industrial Park Hawarden Deeside CH5 3US UK Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 GB II 2D Ex tb IIIC T82 C 145 C...

Страница 17: ...e and Place of Issue London 10 02 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Страница 18: ...CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 GB II 2D Ex tb IIIC T82 C 145 C Db Standards applied EN 60079 0 2018 EN...

Страница 19: ...ate and Place of Issue London 24 02 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the...

Страница 20: ...Page left Intentionally blank...

Отзывы: