background image

_________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           [email protected]              Tel: +44 (0)208 743 8880 

                                                                                                                                                             www.e-2-s.com             Fax: +44 (0)208 740 4200 
Document No. D190-00-251-IS-SC     Issue:  4                        37-08-15               Sheet 2 of 3 

 

The installation of the units must also be in accordance with the 
NEC / CEC and any local regulations and should only be carried 
out by a competent electrical engineer who has the necessary 
training. 

 

The Equipment must not be installed with the horn facing 
upwards of horizontal. 
To maintain the ingress protection rating and mode of protection, 
the cable entries must be fitted with suitably rated cable entry 
and/or blanking devices during installation. If conduit is used for 
installation, seal conduit within 18 inches from the enclosure. 
 
If entries are fitted with adaptors they must be suitably rated for 
the application. Fitting of blanking elements into adaptors is not 
permitted. 
 
If a high IP (Ingress Protection) rating is required then a suitable 
sealing washer or O-ring must be fitted under any cable gland 
or blanking device with metric threads. 

 

Only the explosionproof  cover is to be used for access to the 
enclosure for installation, service and maintenance. 
 
Connections are to be made into the terminal blocks using solid 
or stranded wire, sizes 0.5-2.5mm

2

 / AWG 20-14. Wire insulation 

needs to be stripped 6-7mm. Wires may be fitted securely with 
crimped ferrules. Terminal screws need to be tightened down 
with a tightening torque of 0.4 Nm / 3.5 Lb-in. 
 
Earthing connections should be made to the  Internal Earth 
terminal in the explosionproof  chamber  or the external earth 
stud. 

 

Check that the ‘O’ ring seal is in place before replacing the 
explosionproof cover. 
 

4.2 Mounting 

 
 
 
 
 
 
 
 
 
 
 

Fig. 1 Fixing locations. 

 
D1x  Loudspeakers  should only be installed by trained 
competent personnel. 
 
 
The D1x Loudspeakers may be secured to any flat surface using 
the  three 7mm fixing holes. The enclosure provides IP66 
protection and is suitable for indoor and outdoor use providing it 
is positioned so that water cannot collect in the horn, and the 
cable entry is sealed. 

 
4.3 Installation procedure 
 

a.  Secure the D1x Loudspeaker to a flat surface via the  

three 7mm fixing holes in the mounting bracket. 

 

b.  Remove the explosionproof cover of the loudspeaker by 

unscrewing it, taking care not to damage the threads in 

the process (Refer to section 5).  

 

c.  Fit an M20x1.5 suitably certified cable gland or ½” NPT 

conduit into the corresponding entry in the enclosure and 

connect the field wiring to the appropriate loudspeaker 

terminals as shown in section 6 / Fig 3 (70V Line In) or 

section  7 / Fig  4  (Low Impedance) of this manual. The 

power supply terminals on the low impedance units are 

duplicated so that units may be connected in parallel. An 

end of line monitoring resistor may be fitted to either type 

of unit. Additional entries which are not used must always 

be fitted with suitably certified blanking elements  

 

d.  Replace the explosionproof  cover  of the loudspeaker, 

taking care not to damage the explosionproof  threads 

and checking that the O-ring seal is in place. Tighten the 

cover fully. 

 

4.4 Hornless Variants 

 

The D1x Loudspeaker is also available as a variant with 
no horn fitted in the factory. The Horn threaded nose 
portion has a fitment thread of 1-3/8”  –  18 UNF (to 
BS1580 or ANSI B1.1). The customer is responsible for 
sourcing and correctly fitting a suitable horn that meets 
all of the relevant safety requirements. 
 

5)  Access to the Explosionproof Enclosure 

 
In order to connect the electrical supply cables to the 
loudspeaker it is necessary to remove the explosionproof cover 
to gain access to the explosionproof  chamber.  This can be 
achieved  by unscrewing  the  explosionproof  cover, taking 
extreme care not to damage the explosionproof threads in the 
process 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 

Fig. 2 Accessing the Explosionproof Enclosure. 

 
On completion of the cable wiring installation the explosionproof 
threads should be inspected to ensure that they are clean and 
that they have not been damaged during installation. Also check 
that the ‘O’ ring seal is in place, on the thread diameter in contact 
with the flat face of the explosionproof  cover. When replacing 
the explosionproof cover ensure that it is tightened fully. 
 

6)  70V Line In Wiring 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fig. 3 Line in Terminals 

 
 
 

External Earth 
Assembly 

Flameproof 
cover 

Blanking element 





Internal Earth 
Terminal 

(Appropriate 
cable glands to 
be customer 
supplied) 

Отзывы: