5.  Special Conditions for Safe Use 

 

Repair of the flamepath / flameproof joints is not permitted. 

 

The  enclosure  is  non-conducting  and  may  generate  an 
ignition-capable  level  of  electrostatic  charges  under  certain 
extreme conditions (such as high-pressure steam). The user 
should ensure that the equipment is not installed in a location 
where  it  may  be  subjected  to  external  conditions  that  might 
cause  a  build-up  of  electrostatic  charges  on  non-conducting 
surfaces. 

 

Additionally,  cleaning  of  the  equipment  should  be  done  only 
with a damp cloth. 

 

6.  Product Mounting and Access 

 

The location of the sounder should be made with due regard 
to the area over which the warning signal must be visible. They 
should only be fixed to services that can carry the weight of the 
unit. 

 

The BEx sounder should be secured to any flat surface using 
at least two of the three 7mm fixing holes on the stainless steel 
U shaped mounting bracket. See Figure 1. The required angle 
can be achieved by loosening the two large bracket screws in 
the side of the unit, which allow adjustment of the sounder in 
steps of 18°. On completion of the installation then two large 
bracket adjustment screws on the side of the unit must be fully 
tightened to ensure that the unit cannot move in service. 
 
 
 
 
 
 

 
 
 
 
 

Fig. 1a Fixing Location for Sounder Flare 

 
 

 
 
 
 
 
 
 
 

Fig. 1b Fixing Location for Sounder Radial 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

7.  Access to the Flameproof Enclosure 

 

 

 

To  access  the  Ex  d  chamber,  remove  the  four  M6  hexagon 
socket head screws and withdraw the flameproof cover taking 
extreme  care  not  to  damage  the  flameproof  joints  in  the 
process. M6 cover screws are Class A4-80 stainless steel and 
only screws of this category can be used for the enclosure. 

 

 

Fig. 2 Accessing the Explosion proof Enclosure. 

 

On completion of the installation, the flameproof joints should 
be inspected to ensure that they are clean and that they have 
not been damaged during installation. 

 

Check that the earth bonding wire between the two castings is 
secure  and  the  ‘O’  ring  seal  is  in  place.  When  replacing  the 
flameproof  cover  casting  ensure  that  it  is  square  with  the 
flameproof  chamber  casting  before  inserting.  Carefully  push 
the cover in place allowing time for the air to be expelled. Only 
after  the  cover  is  fully  in  place  should  the  four  M6  Stainless 
Steel  A4-80  cover  bolts  and  their  spring  washer  be  inserted 
and tightened down. If the cover jams while it is being inserted, 
carefully remove it and try again. Never use the cover bolts to 
force the cover into position. 

 
 

 

Warning – High voltage may be present, 
risk of electric shock. DO NOT open when 
energised, disconnect power before 
opening. 

Warning – Hot surfaces. External surfaces 
and internal components may be hot after 
operation, take care when handling the 
equipment. 

(Appropriate cable glands 
to be customer supplied) 

Flameproof cover  

M6 Cover 
Screws 

M6 Spring 
Washer 

Содержание BExS120D

Страница 1: ...44 The table shows the input current taken by the various sounders The current levels shown above are for the 440Hz Continuous tone nominal input voltage Nominal current at nominal voltage Table 1 Ele...

Страница 2: ...f it does it will only exist for a short time Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC Hydrogen and Acetylene up to 55 C ambient Temperature Classification for Gas Applications T1...

Страница 3: ...tightened to ensure that the unit cannot move in service Fig 1a Fixing Location for Sounder Flare Fig 1b Fixing Location for Sounder Radial 7 Access to the Flameproof Enclosure To access the Ex d cha...

Страница 4: ...are both located on the terminal chamber section of the unit Fig 3 Internal View of Cover When using the internal earth terminal ensure that the stainless steel M4 flat washer is between the incoming...

Страница 5: ...nimum power rating of 0 5 watts or a minimum resistance value of 500 and a minimum power rating of 2 watts The resistor must be connected directly across the ve and ve terminals as shown in the follow...

Страница 6: ...current relevant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and...

Страница 7: ...mittent 660Hz 1 8s on 1 8s off 1 0 0 0 1 0 2 5 19 1400Hz to 1600Hz sweeep up over 1s 0 1 0 0 1 0 2 5 1600Hz to 1400Hz sweep down over 0 5s 20 Continuous 660Hz 1 1 0 0 1 0 2 5 21 Alternating 554 440Hz...

Страница 8: ...ISARD R N POTTS OF NTS 1 1 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 500 MIN 2W MIN OR 3K3 MIN 0 5W MIN MINIMUM VALUES R1 Single Stage Configuration Config 1a Optional Line Monitoring Heade...

Страница 9: ...TE ISSUE DATE APPROVED CHECKED DATE DATE DRAWN WEIGHT Kg SURFACE FINISH MATERIAL ALTERNATIVE MATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F...

Страница 10: ...nds B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIB or IIC T4 Gb II 2G Ex db eb IIB or I...

Страница 11: ...are in accordance with the restriction of the use of hazardous substances in electrical and electronic equipment including amendment by Directive 2015 863 EU Regulation EC 1907 2006 Registration Evalu...

Страница 12: ...duction process Module D Sira Certification Service Notified Body No 0518 Rake Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the eq...

Страница 13: ...and Place of Issue London 12 09 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the...

Страница 14: ...Page left Intentionally blank...

Страница 15: ...Page left Intentionally blank...

Страница 16: ...Page left Intentionally blank...

Отзывы: