E2S BExS110D-R Скачать руководство пользователя страница 2

_______________________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           [email protected]              Tel: +44 (0)208 743 8880 

                                                                                                                                                             www.e-2-s.com             Fax: +44 (0)208 740 4200 
Document No. D210-00-001-IS           Issue 4          28-03-17                         Sheet 2 of 8                                                                                            

 

3)  Type Approval Standards

 

 

The sounder carries an EC Type Examination Certificate and 
IECEx Certificate of Conformity, and have been certified to 
comply with the following standards: 

 

EN60079-0:2012+A11:2013 / IEC60079-0:2011 (Ed 6):  
Explosive Atmospheres - Equipment. General requirements 

 

EN60079-1:2007 / IEC60079-1:2007 (Ed 6):  
Explosive Atmospheres - Equipment protection by flameproof 
enclosures "d" 

 

EN 60079-31:2014 / IEC60079-31:2013 (Ed 2):  
Explosive Atmospheres - Equipment dust ignition protection 
by enclosure "t" 

 

4) Installation 

Requirements

 

 

The sounder must only be installed by suitably qualified 
personnel in accordance with the latest issues of the relevant 
standards: 

 

EN60079-14 / IEC60079-14: Explosive atmospheres - 
Electrical installations design, selection and erection 

 

EN60079-10-1 / IEC60079-10-1: Explosive atmospheres - 
Classification of areas. Explosive gas atmospheres 

 

EN60079-10-2 / IEC60079-10-2: Explosive atmospheres –  
Classification of areas. Explosive dust atmospheres 

 

The installation of the sounder must also be in accordance 
with any local codes that may apply and should only be 
carried out by a competent electrical engineer who has the 
necessary training. 

 

5)  Special Conditions of Use 

 

Repair of the flamepath / flameproof joints is not permitted. 

 

The enclosure is non-conducting and may generate an 
ignition-capable level of electrostatic charges under certain 
extreme conditions (such as high-pressure steam). The user 
should ensure that the equipment is not installed in a location 
where it may be subjected to external conditions that might 
cause a build-up of electrostatic charges on non-conducting 
surfaces. 

 

Additionally, cleaning of the equipment should be done only 
with a damp cloth

 

6)  Location and Mounting

 

 

The location of the sounder should be made with due regard 
to the area over which the warning signal must be visible. 
They should only be fixed to services that can carry the 
weight of the unit. 

 

The BEx sounder should be secured to any flat surface using 
the three 7mm fixing holes on the stainless steel U shaped 
mounting bracket. See Figure 1. The required angle can be 
achieved by loosening the two large bracket screws in the 
side of the unit, which allow adjustment of the sounder in 
steps of 18°. On completion of the installation then two large 
bracket adjustment screws on the side of the unit must be 
fully tightened to ensure that the unit cannot move in service. 

 

Fig. 1 Fixing Location for Sounder Flare 

 

Fig. 1 Fixing Location for Sounder Radial 

 

7)  Access to the Flameproof Enclosure

 

 

 

 

To access the Ex d chamber, remove the four M6 hexagon 
socket head screws and withdraw the flameproof cover taking 
extreme care not to damage the flameproof joints in the 
process. M6 cover screws are Class A4-80 stainless steel 
and only screws of this category can be used for the 
enclosure. 

 

Fig. 2 Accessing the Explosion proof Enclosure. 

 

On completion of the installation, the flameproof joints should 
be inspected to ensure that they are clean and that they have 
not been damaged during installation. 

 

Check that the earth bonding wire between the two castings 
is secure and the ‘O’ ring seal is in place. When replacing the 
flameproof cover casting ensure that it is square with the 
flameproof chamber casting before inserting. Carefully push 
the cover in place allowing time for the air to be expelled. 
Only after the cover is fully in place should the four M6 
Stainless Steel A4-80 cover bolts and their spring washer be 
inserted and tightened down. If the cover jams while it is 
being inserted, carefully remove it and try again. Never use 
the cover bolts to force the cover into position. 

Warning – Hot surfaces. External surfaces 
and internal components may be hot after 
operation, take care when handling the 
equipment. 

Warning – High voltage may be present, 
risk of electric shock. DO NOT open when 
energised, disconnect power before 
opening. 

(Appropriate cable glands 
to be customer supplied)

Flameproof cover  

M6 Cover 
Screws 

M6 Spring 
Washer 

Содержание BExS110D-R

Страница 1: ...99ATEX6312X IECEx KEM 10 0003X The units can be installed in locations with the following conditions Area Classification Gas Zone 1 Explosive gas air mixture likely to occur in normal operation Zone 2 Explosive gas atmosphere not likely to occur in normal operation but may be present for short periods Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC Hydrogen and Acetylene up to 55 C am...

Страница 2: ...d Mounting The location of the sounder should be made with due regard to the area over which the warning signal must be visible They should only be fixed to services that can carry the weight of the unit The BEx sounder should be secured to any flat surface using the three 7mm fixing holes on the stainless steel U shaped mounting bracket See Figure 1 The required angle can be achieved by loosening...

Страница 3: ...o NPT M20 to M25 It is important to note that stopping plugs cannot be fitted onto adapters only directly onto the M20 entries Any other adapters used must be suitably rated and ATEX IECEx certified adapters 10 Earthing Both AC and DC sounder units must be connected to an earth The units are provided with internal and external earth terminals which are both located on the terminal chamber section ...

Страница 4: ... Operation Simply connect the supply voltage to the L and N supply terminals see fig 4 12 2 2 AC Units Second Third Stage Tone Selection To select the second and third stage tones on the BExS110 AC sounder Stage two S2 Operation Power L and N link the Common C and S2 terminal Dip switch alters stage 2 tone Stage three S3 Operation Power L and N link the Common C and S3 terminals Dip switch alters ...

Страница 5: ...e the facility to use either ve or ve switching to change the tone to the second and third stages Negative switching is the default setting For ve switching connect the two headers on the pcb to the left hand marked ve and centre pins For ve switching connect the headers to the right hand marked ve and the centre pins Refer to Fig 7 Fig 7 Stage Switching Polarity 13 4 Line Monitoring On BExS110D D...

Страница 6: ...e set by adjusting the volume control potentiometer see Fig 9 For maximum output set the potentiometer fully clockwise BExS110D AC BExS110D DC Fig 9 Location of Volume Control Potentiometer 15 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 1...

Страница 7: ... 1 0 Tone 31 Tone 1 12 Alternating 800 1000Hz at 0 875Hz 1 1 0 1 0 Tone 4 Tone 5 13 Intermittent 2400Hz at 1Hz 0 0 1 1 0 Tone 15 Tone 5 14 Intermittent 800Hz 0 25s on 1s off 1 0 1 1 0 Tone 4 Tone 5 15 Continuous at 800Hz 0 1 1 1 0 Tone 2 Tone 5 16 Intermittent 660Hz 150mS on 150mS off 1 1 1 1 0 Tone 18 Tone 5 17 Alternating 544Hz 100mS 440Hz 400mS 0 0 0 0 1 Tone 2 Tone 27 18 Intermittent 660Hz 1 8...

Страница 8: ...8 0 106 7 103 4 102 1 104 2 106 0 107 2 106 8 103 4 101 7 3 500 1200Hz 0 3Hz 0 5 Sec Slow Whoop 106 8 108 9 108 8 107 0 107 6 104 6 106 1 107 6 109 6 109 1 106 9 105 6 9 1200 500Hz 1Hz DIN PFEER P T A P 105 6 106 8 107 4 106 4 106 2 103 6 104 1 105 3 106 8 106 7 105 0 103 3 15 800Hz Continuous 100 1 103 3 105 6 107 6 103 0 100 3 10 2 102 9 105 2 106 8 102 4 99 6 16 660Hz 150mS ON 150mS OFF Intermi...

Отзывы: