H
OW
T
O
S
ET
U
P
I
NFORMATION
Please read each step before you attempt to set up.
Save these instructions for future reference.
8.
With partner, lift adjacent
outer legs and slide out the inner
legs until the snap button locks.
Repeat on the remaining two
legs.
2.
Release pull pin at each
corner by first lifting fabric up
away from slider. Pull the pull pin
ring out to release.
3.
With partner on opposite
side, grasp the top of diamond
on opposite sides by the “close“
stickers. Lift the shelter up slight-
ly and off the ground while slow-
ly stepping toward your partner
until the unit is 3/4 closed. With
each partner grasping two outer
legs, push frame together to
fully close it -
Be careful not to
pinch fingers.
Store shelter in
cover bag in upright position.
1.
Place your E-Z UP
®
frame in
the center of area to be shaded.
With partner on opposite side, grasp
outer legs, lift off the ground, and
step backwards - stopping at full
arm’s length - approximately 3/4
it’s total size.
*3.
Attach the top to the frame
at all four corners by matching
Velcro
®
strips on the top with the
Velcro
®
strips on the frame. Push
the Velcro
®
firmly together at each
corner.
*2.
Gently unfold the fabric top
and place it over the open frame.
*4.
To bolt the top to frame,
line up grommet holes on valance
with the top attachment nuts on
the frame, identified with red
instruction tag.
*5.
Unscrew top attachment nut
from bolt. Place grommeted top
over the bolt, screw on top attach-
ment nut and tighten until snug.
Top should rotate easily - do not
overtighten. Repeat on remaining
grommets.
6.
With partner on opposite
short side, grasp the bottom of the
diamond by the “open” stickers.
Lift up and step backwards slowly
until shelter is fully opened. Be
careful not to pinch fingers.
7.
Engage the slider at each
corner by pushing up with one
hand while holding down the top
of the leg with the other hand. The
pull pin will engage in the hole.
Then pull down the fabric of the
top. Repeat on remaining corners.
*Note: First Time Attachment Is Required.
Top and frame are shipped unattached to avoid damage. A first time set
up requires that top be bolted on to the frame. This first time set up
takes a few minutes. Once top is permanently attached to frame, set up
and take down are easily accomplished within seconds.
H
OW
T
O
T
AKE
D
OWN
1.
With partner, lift up two
adjacent outer legs, depress snap
button and telescope the inner
legs up into the outer legs.
Repeat on the remaining two
legs.
Tag
Spacer
Angle bracket
Trusses
Pull Pin
Top Attachment Nut
Top Attachment Nut
Note:
Once top is permanently attached, only perform steps 1,
and 6,7,8 to set up.