INTERNATIONAL E-Z UP, INC.
1900 Second St., Norco, California 92860
800-45-SHADE
The #1 Instant Shelter
®
Brand in the World
ezup.com
Fig. A
Fig. B
Fig. C
Fig. D
Fig. E
Fabric Top Corner
Auto-Slider
®
Pull Pin
Loop
Hook
Outer Trusses
Leg Adjustment
Toggle Button
Dome
TM
Box Includes:
(1) 10’ Dome
™
Frame, (1) Recreational Grade Top, (1) 4-Piece Spike Kit and (1) Wide-Trax
™
Roller Bag
ONE-TIME TOP INSTALLATION
SET UP
Unpack and Open
1.
Place your E-Z UP
®
Frame
in the center of the area to be sheltered.
2.
With a partner on the opposite side of the
Frame
, grasp two outer legs, lift the
Frame
slightly off the ground, and step
backward while pulling the
Frame
to open.
3.
Stop when the
Frame
is approximately 3/4 of its fully-opened size.
(Fig A)
4.
Set the
Frame
back on the ground.
Attach Fabric Top
5.
Gently unfold the
Fabric Top
, and place it over the semi-opened
Frame
.
6.
Attach the
Fabric Top
to the E-Z UP
®
Frame
by matching the
Hook and Loop
Strips
on the inside of the
Fabric Top
corners with the
Hook and Loop Strips
on each
Frame
corner.
(Fig B)
7.
Pull the
Fabric Top
down over the
Frame
corners—pushing the
Hook and Loop Strips
firmly together.
Open E-Z UP
®
Shelter
1.
With a partner on the opposite side, grasp the bottom of the diamond-shaped area of
Outer Trusses
near the “OPEN
HERE” sticker.
(Fig C)
2.
Lift the
Frame
up slightly and step backward until the shelter is almost fully opened. Gently shake the shelter while
opening.
Be careful not to pinch fingers!
Secure Auto-Slider
®
Pull Pin
3.
Fold up the
Fabric Top
corner to expose the
Auto-Slider
®
Pull Pin. (Fig D)
4.
Lift shelter corner slightly off the ground and engage the
Auto-Slider
®
Pull Pin
by pushing up on the
Frame
side trusses
with one hand while holding down the top of the
Frame Leg
with the other hand. The pins will auto-engage when
aligned with the holes on the
Frame Legs.
5.
After the
Auto-Slider
®
Pull Pin
has locked into place, pull the
Fabric Top
down over the
Frame Leg
, making sure to
align and secure the hook and loop strips on the
Fabric Top
to the
Frame.
6.
Repeat on all remaining corners.
Extend Frame Legs
7.
With a partner, lift the two adjacent outer legs up off the ground simultaneously to about waist height.
8.
Slide the lower/inner legs out until the
Leg Adjustment Toggle
buttons lock at selected height on each leg.
(Fig E)
Note: There are 2 adjustment settings on each leg.
9.
Repeat on the remaining legs.
Note: It is recommended that you use genuine E-Z UP
®
Deluxe Weight Bags and/or Heavy-Duty Stake Kits to
secure your shelter.
Your E-Z UP
®
shelter setup is now complete!