background image

         

 

Step 6: 

Next you can either add each of the stud wall pieces or assemble them all together on the ground and fit 

them in the base at once. Make sure you measure and evenly space all the brackets top and bottom. Next add your 
angled corner bracing to make your structure solid and rigid so you can add your trusses. Add your trusses to the top 
of each stud. When adding your trusses make sure the 120 degree ridge brackets are all facing the same direction so 
you will be able to add your ridge board. Add your ridge and top side wall boards by sliding them through the 
brackets and screwing them in to place. Make sure to measure again so all the boards are space evenly. Please see 
side elevation diagram below. 

Содержание 6X6 Chicken Coop & Run

Страница 1: ... or treated lumber Treated lumber redwood or cedar is best if planning to place your structure directly on the ground 400 1 wood screws 6 Hinges Be sure to buy a size hinge that will support the weight of your door 2 Door Latch Materials needed to cover your structure depending on use This can be plastic tarps glass Chicken wire siding or metal Or use your imagination Tools needed to complete stru...

Страница 2: ...lumber for you for free or a minimal charge Cut your lumber as follows Note As you measure and cut your lumber done easily with a chop saw please make sure you label each piece with the corresponding letter on your lumber cut list as this makes it easier to tell apart and assemble later Wait to cut boards H E and G until structure is complete to adjust door as needed Out of an 8 piece of lumber cu...

Страница 3: ...o together properly Layout your brackets and lumber for your base per the floor plan diagram below Only put a single screw in piece of lumber on the door side of the building as you may have to adjust the studs to make sure the door fits correctly depending on the size hinges you will be using Step 5 Next assemble your roof trusses It is typically easier to assemble them on the ground and then put...

Страница 4: ... your structure solid and rigid so you can add your trusses Add your trusses to the top of each stud When adding your trusses make sure the 120 degree ridge brackets are all facing the same direction so you will be able to add your ridge board Add your ridge and top side wall boards by sliding them through the brackets and screwing them in to place Make sure to measure again so all the boards are ...

Страница 5: ... you will not be covering this wall or O boards to frame a chicken door area since it is located right next to the rear wall You can build an optional chicken ramp leading to the inside of your coop area to allow chickens to freely roam between the coop and run area and then close off while cleaning The coop area is a raised surface you can adjust the height of the floor by raising or lowering you...

Страница 6: ... door There may be a small gap on either side of the door this is designed so that if you purchase a non flush hinge the door will still open and close If you do not wish to have a gap you can cut your door assembly boards slightly larger for that or adjust the K boards to compensate Finally measure and cut your E boards these might be a slightly different length if you have adjusted the door asse...

Страница 7: ...over that Add each section of like materials together to determine the total amount of sqft you will need of that material Step 10 Stand back and admire your work Thanks for ordering E Z Frames If you have any questions regarding your structure please feel free to visit us at our website www ezframeup com E Z Frame Structures Shelters LLC E Z Frame Structures Shelters LLC and E Z Framestructures c...

Страница 8: ......

Отзывы: