
25
DEPLOYMENT PROCEDURE
Set-up conditions
•
External power supply isolated.
•
Appliance disconnected from the water mains and empty.
•
All boiler valves closed.
•
Manual air vent closed.
Procedure
1. Bring the appliance to the deployment location.
2. Place it vertically, on a flat surface, ensuring easy access
to the electrical and hydraulic connection points.
3. Unlock side safety latches (
1
) and remove Flex socket cov-
er (
2
). Retain the cover (
2
) for later reinstallation.
4. Connect the appropriate power cable plug to the Flex
socket (
3
) and lock in position with side safety latches (
1
).
• In
stall the heating piping system before
connecting to the boiler.
• The quick connect adapters can be removed in
order to carry out a typical hydraulic connection.
5. Connect the water supply and return circuits using the
quick connect adapters (
4
).
Follow-on tasks
1. Fill the system refer to
“Filling the System” on page 26
.
MOVING THE APPLIANCE AROUND
DEFINING THE DEPLOYMENT LOCATION
If the appliance was in operation, perform tear-down
procedure before moving it around. Refer to
"Tear-
Down" on page 31
To move the appliance around, make sure that :
•
The tire pressure is sufficient (the required pressure is
stamped on the tire side). Inflate the tire(s) if required
•
The passages are wide enough,
•
There are no obstacles or obstructions on the path. If there
are and the appliance needs to be lifted, use an appro-
priate lifting means or ask for help (at least 2 people are
required to lift the appliance).
•
The deployment location complies with the requirements in
the safety instructions.
•
The deployment location has a hard and level surface.
•
The appliance can be easily connected to the water source
and electrical supply,
1
1
22
33
IP66 FlexPower®
1 PH
3 PH
Valves in closed position
4
4
EN
Deployment