![e-survey E200 Скачать руководство пользователя страница 29](http://html2.mh-extra.com/html/e-survey/e200/e200_user-manual_3151701029.webp)
23
4.6.2 Start IMU Tilt Measurement
It is required when tilt measurement is used and IMU is used.
Before starting IMU tilt measurement, to enable IMU tilt measurement, in SurPad software,
press main menu
Device
→
Device Setting
, and set tilt survey to
Pole Tilt Correction
.
To start IMU tilt measurement in SurPad software, press main menu
Survey
→
Point
Survey
to enter the main interface of point survey, and do as the prompt in the interface:
Status
What it means
What to do
Magnetic calibration is required.
Take the pole and draw a circle
towards the ground.
Initialization is required.
Shake the pole or walk around.
The accuracy of tilt measurement is
not enough.
Wait for better signals.
The tilt angle exceeds 60°.
Make sure the tilt angle is within 0° -
60°.
Tilt measurement is successfully
enabled.
Start survey.
Содержание E200
Страница 1: ...Shanghai eSurvey GNSS Co Ltd E200 GNSS RECEIVER USER GUIDE 1st Edition V2 0...
Страница 2: ......
Страница 4: ...SHANGHAI ESURVEY GNSS CO LTD...
Страница 6: ...SHANGHAI ESURVEY GNSS CO LTD II...
Страница 13: ...7 3 2 Datalink In Datalink page you can check the current datalink...
Страница 28: ...SHANGHAI ESURVEY GNSS CO LTD 22 6 To save the result press Save The following interface shows...
Страница 32: ......
Страница 33: ......