User guide
AEM10941
User guide
AEM10941
User guide
AEM10941
Observation and measurements
-
SRC
: Equal to the cold-start voltage during the cold-
start phase. Regulated at the selected MPPT percent-
age of
Voc
when cold start is over (see Figure 6). Be
careful that the cold-start phase time will shorten with
the input power. Limit it to ease the observation.
-
BATT
: Starts to charge when the cold-start phase is over
(see Figure 6).
0
1
2
3
4
5
6
0
0
.
25
0
.
5
0
.
75
1
Vcs
Time [s]
V
o
lt
ag
e
[V
]
SRC
BATT
Figure 6: AEM10941 behaviour during cold start
3.5
Dual-cell supercapacitor balancing circuit
This test allows users to observe the balancing circuit behavior
that maintains the voltage on BAL equilibrated.
Setup
1. Following steps 1 and 2 explained in Section 2.1 and re-
ferring to Figure 1, configure the board in the desired
state. Plug the jumper linking ”BAL” to ”ToCN”.
2.
BATT
: Plug capacitor C1 between the positive (+) and
the BAL pins and a capacitor C2 between BAL and the
negative (-) pins.
Select C1
6
=
C2 such that:
- C1 & C2
>
1 mF
-
C2
∗
Vchrdy
C1
≥
0
.
9 V
3.
SRC
: Plug your source element to start the flow of power
to the system.
Measurements
-
BAL
: Equal to half the voltage on
BATT
.
9
UG AEM10941 REV1.0
Copyright c
2018 e-peas SA
9
UG AEM10941 REV1.0
Copyright c
2018 e-peas SA
9
UG AEM10941 REV1.0
Copyright c
2018 e-peas SA