background image

™

 

THE CORRECT POSITION IN THE INSTALLATION ROOM 

 

 

 

 

 

 

 

 

NOTES: 

  The position of water inlet, water outlet & gas pipe shall be according to the marks on water heater body. 

  Check carefully after installation; make sure there is no gas or water leakage. 

  Rubber hose should not be longer than 2 m. 

  No wire, pipe or hose should go through behind or above water heater body. 

 

3.3  How to install   

™

 

INSTALLATION OF THE HANGER --- SHOULD BE INSTALLED HORIZONTALLY 

 

 

 

 

 

 

The walls sensitive to heat, for example wood, shall be protected by suitable insulation. We advise you to 
equip the appliance on the fire-proof wall, in case of non fire-proof wall, please underlay a fire-proof board, 
100 mm bigger than the water heater from every side and 10 mm away from the wall. It should not be fixed 
directly on the wall which is sensitive to heat, for example wood, shall be protected by suitable insulation, 
such that the clearance between the wall on which the appliance is installed and the hot parts on the outside 
of the boiler are observed. 

 

 

 

   

   

   

 

 

 

 

™

 

HANG UP THE WATER HEATER 

Hang up the water heater onto the hanger vertically 

 

™

 

INSTALLATION OF VENT-PIPE 

 

 

 

 

™

 

Diameter of the vent pipe 

Model 

Inner diameter 

Outer diameter 

6L 

Ø 90 

Ø 90+2 mm 

7L 

Ø 90 

Ø 90+2 mm 

8L, 9L, 10L 

Ø 110 

Ø 110+2 mm 

12L 

Ø 110 

Ø 110+2 mm 

16L 

Ø 135 

Ø 135+2 mm 

 

An adapter can be used to help users to join the present flue pipe to other flues of different diameter. 

 

™

 

HOW TO SET UP VENTILATION PASSAGE 

A  Air-in hole should be at a well-ventilated position below ½ of the room height. 
B  The vent hole should be set outside and near the top of the room and far from the vent-pipe in a 

ventilation condition.   

C  Air entry and Vent area   

THERMAL 

BURDEN (kW) 

MIN. AREA OF THE AIR-IN HOLE 

AND VENT HOLE (cm

2

12 100 

12~16 130 
16~20 160 
20~26 200 

The water heater must have the vent-pipe installed. Vent-pipe installation should be as 

follows: 

The height of the vent-pipe should be so as to ensure the complete exhaust of the smoke to 

the outside. 

B The horizontal part of the vent-pipe should be less than 3 m, and the vent should be 

inclined down a little so that the condensate water or rains does not flow backwards. 

C Elbow of the vent-pipe should be 90° and should not consist of more than 3 pcs.   

D The outer part of the vent-pipe should be at least 250 mm above the start of the roof. 

E Top of the vent-pipe should be fitted with a wind cap to prevent the ingress wind, rain and 

snow. The location of the wind cap should not be in the Æolian zone. The distance should 

not be less than 600 mm against the building around and its hatch. 

F The vent pipe should be installed in clear air, and not in the path of other air passages. 

G Make sure there are no air leakage at the joints by fixing it tightly with bolts. 

Содержание JSD 12 E

Страница 1: ...RUCTIONS FOR THE INSTALLATION AND MAINTENANCE OF HOUSEHOLD INSTANTANEOUS INDOOR LPG GAS WATER HEATER TYPE B VENT PIPE Model No JSD 12 E LPGSASA Permit No _______ E Gas Systems The Proven Preferred Cho...

Страница 2: ...n 4 3 2 Installation 4 3 3 How to install 5 3 4 The performance of vent pipe anti block device 7 3 5 Repair and Maintenance 7 4 INSTRUCTIONS FOR THE USER 8 4 1 Operation 8 4 2 NOTES ON SAFETY 8 5 INST...

Страница 3: ...are a potential hazard source To safeguard the environment all packaging materials are environment friendly and recyclable Prior to connecting the appliance ensure that the rating plate data correspon...

Страница 4: ...by qualified installer The manufacturer cannot be held responsible for any damage to persons or things deriving from an incorrect installation of the appliance 3 1 2 The safety and automatic adjustmen...

Страница 5: ...135 2 mm An adapter can be used to help users to join the present flue pipe to other flues of different diameter HOW TO SET UP VENTILATION PASSAGE A Air in hole should be at a well ventilated positio...

Страница 6: ...linkage 2 Clean carbon accumulation on buckling piece of heat exchanger 3 Grease gas valve and its core 4 Carbon accumulation and oxidation coating on ignition and induction needles 8 4 INSTRUCTIONS F...

Страница 7: ...ease turn off the water inlet and press the reset button of the thermostat then turn them on again If there are repeated interruptions please call specialist for help 4 2 7 Avoid scald To resume using...

Страница 8: ...ulation method of water temperature Enlarge gas volume reduce water volume Reduce gas volume enlarge water supply Improper position of water switch Turn water knob to hot water point Surroundings Air...

Страница 9: ...ial number and type of problem you are having with it You will find the relative data printed on a label affixed behind the appliance and on the label affixed on the cover of this handbook With this i...

Страница 10: ...The appliance was designed and manufactured in accordance to International Standards and is certified as a safe appliance by the Liquid Petroleum Gas Safety Association of South Africa...

Отзывы: