Horizontal (Ø60 / 100 mm) Room Sealed Horizontal Flue Set (7006850049) consists of the
following parts;
1. 90° C Elbow
2. Waste Gas Plug
3. Air Inlet Plug
4. Sealing Gasket Ø 60
5. Sealing Gasket Ø 100
6. Flange Screws
7. Flue Connection Flange
8. Clamping Screw and Nut
9. Flange Gasket
10. Flue Outlet Terminal
11. Interior Wall Connection Flange
12. Exterior Wall Connection Flange
Connection of Horizontal (Ø60 / 100 mm) Room Sealed Flue Set to the Combi Boiler
Because your combi boiler is a room sealed model, it takes the air it uses from the outer environ
-
ment and discharges the waste gases that form as a result of the combustion to the outer environ
-
ment from the same flue group. The use and installation of the flue is very important in order to
prevent the emission of highly harmful waste gases to the environment, so the warnings must be
considered when making flue connections.
INFORMATION
• Make the flue selection for the flue connection to where your combi boiler is installed and the outer
environment. If the standard flue set is not enough for installation, choose the most suitable accesso
-
ries from our list of connection accessories, taking into account the warnings mentioned in our user
manual.
• Fix the flue connection flange by screwing it into the holes on the combi boiler using the flange
gasket. (Figures 9a-9b)
• Place the two sealing gaskets, which come out of the room sealed flue set, into the inner tube
grooves at both ends of the 90° elbow.
• Fit the EPDM joint gasket to the 90° elbow in such way that it touches the limiting set inside the
gasket.
• Place the two sealing gaskets, which come out of the room sealed flue set, to the part of the elbow
where extension piece is to be mounted.
• In order to group the flue outlet terminal, fit the exterior wall gasket to the flue extension piece.
• Install the interior wall joint gasket on the flue terminal after passing the flue through the flue hole
opened on the wall. (Figure 9c)
• Fit the flue extension piece to the 90° elbow. (Figure 9d)
• Then place the 90° elbow on the flue connection flange and fasten it with the clamping screws.
(Figure 9e) Finally, after tightening the screws on the EPDM gasket that we have placed and left loose,
push the interior wall joint gasket in a way it touches the wall to ensure sealing of the wall and the flue.
The horizontal outlets should be installed with an upward slope of 1-2% to
the outside so that they do not discharge the condensation water out.
6
7
8
9
10
11
12
12
Figure 8
Содержание KRONOS KR 24 HM
Страница 1: ...KRONOS KR 24 HM ROOM SEALED MONOTHERMIC COMBI BOILER INSTALLATION AND USER MANUAL kronos Call Center...
Страница 30: ......
Страница 31: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ...7006850147...