4
Boiler Start-up
Boiler start-up must be performed certainly by qualified person.
Gas type (natural gas / LPG), gas supply pressure (mbar) and electricity supply voltage (V) data
which are detailed on the information plate must be suitable with mains supply conditions. This is
checked by qualified person.
Before connecting the flue, siphon must be filled with water to prevent the risk of flue gases
escaping into the installation room.
Lubricate the internal parts of the seals before the assembling of the air / flue ducts.
After boiler start-up, you should request information about operating the boiler and safety
precautions from qualified person.
Operating The Boiler And Maintenance
Read carefully instructions and precautions in this manual against wrong usage which causes
unsafe conditions.
The boiler should be checked and serviced for general maintenance once a year. Maintenance
and service operations must be carried out only by qualified person.
Only a damp cloth should be used for cleaning the outer surface of the boiler and then the
surfaces should be dried completely. Do not use chemical subtances or solutions which cause rust
and scratches in your appliance.
5
6
Содержание Confeo Premix CP 24 HST
Страница 10: ...9 fig 1 agram...
Страница 12: ...11 b a...
Страница 19: ...18 fig 9...
Страница 20: ...19 fig 10 7 B for CP 24 HM P 4 m for CP 30 HM P and 5 m for CP 35 HM P models...
Страница 21: ...20 fig 11...
Страница 22: ...21 h fig 13 a...
Страница 23: ...22 fig 13...
Страница 24: ...23 fig 14...
Страница 25: ...24 fig 15...
Страница 41: ...41 a Flow Adjusment b Offset Adjustment fig 30 fig 31...