DYS DWA-2000A-SS Скачать руководство пользователя страница 13

 

DWA-2000A-SS                                    Suspended Solids Controller  

 

 

Daeyoon Scale Industry Co.,LTD.

                                                                  

- 13 - 

You  can  choose  CL1  (cleaning  period)  by  pressing  the            key  thirteen  times,  CL2  (cleaning 
duration/ time) by pressing it fourteen times, or CL3 (delay time after cleaning) by pressing it fifteen 
times. 
 
The value will blink when the              is pressed. 
 
Input a value using            and              keys.    (CL1 cleaning period: the unit is 1 minute; CL2 cleaning   
 
duration: the unit is 1 second; CL3 delay time after cleaning: the unit is 1 second) 
 
And press the            key after inputting the data 
 

 

When the contact point of cleaning outputs is ON, the RUN lamp continues to be turned on.     

If the input data of the cleaning period or the cleaning duration is zero (0), there is no cleaning output. 

 

    7) Manual cleaning output 

-

 

The cleaning output can be carried out manually. 
 
When the            is pressed for 3 seconds, the contact point of cleaning outputs is turned on and then 
it will be turned off automatically in 10 seconds.   

 

14. Installation   

        The  body  of  the  instrument  is  manufactured  in  accordance  with  DIN96  standards  and  can  be  installed 
using  parts  that  come  with  the  device.    The  detection  part  can  be  fixed  at  a  measurement  location  with 
brackets found in the standard parts.    When installing the instrument and the detection part, you are advised 
to be careful about the followings: 

-

 

To avoid a wet and damp place as much as possible   

-

 

To avoid a place where corrosive gases are present 

-

 

To avoid a place that are exposed to direct sunlight   

-

 

To avoid where there are strong inductive magnetism and vibration generated by a motor 

-

 

To find a place that is convenient for repairs and maintenances 

  

15. Wiring 

-

 

 Sensor cable, current output, and power line have to be connected with the terminals on the reverse 
side of the instrument as indicated on the Input/ Output indication panel. 

 

EARTH

Y

a
Y

c
Y

b

A

L

A

R

M

-

L

O

W

Y

c

Y

a

Y

b

S

E

N

S

O

R

G

(A

)

R

(K

)

E

T

T

C

U

R

R

E

N

T

C

-

C

+

A

L

A

R

M

-

H

IG

H

EARTH

A

C

O

M

B

A

L

A

R

M

-

L

O

W

C

O

M

A

B

S

IG

G

N

D

+5

V

T

T

C

U

R

R

E

N

T

C

-

C

+

A

C

A

C

P

O

W

E

R

A

L

A

R

M

-

H

IG

H

S

E

N

S

O

R

C

L

E

A

N

E

R

A

C

A

C

For ground (earth)

Power source 

(AC110V, AC220V)

For external HIGH output

For external LOW output

CLR

(from sensor)

Electrode

Temperature

Analog output

S

E

N

S

O

R

Содержание DWA-2000A-SS

Страница 1: ...Operating Instruction Manual On line Suspended Solids Controller MODEL DWA 2000A SS Daeyoon Scale Industrial Co Ltd...

Страница 2: ...nsation ATC 2 Input of Manual Temperature Compensation MTC 3 Adjustment of magnitude of electrode temperature compensation 13 Setting of Miscellaneous Functions 1 ZERO compensation 2 Coefficient compe...

Страница 3: ...ng sewage treatment plants livestock and night soil treatment facilities industrial waste and water treatment plants to name a few The DWA 2000A SS is installed with all circuits including isolation f...

Страница 4: ...B Be noted that the accuracy and reliability of measured figures are not guaranteed if the procedures and methods stated in the instruction manual are not duly followed 4 Applicable processes Water p...

Страница 5: ...time 120 sec 90 saturation Analog output 4 20mA DC STD Relay output High Low Cleaning Contact Display measuring value 7 segment Humidity max 90 non condensing IP Rating IP54 Size 96 W x96 H x125 D Ins...

Страница 6: ...2 Setting of manual temperature compensation MTC in case there is no temperature sensor 5 C 3 Input of compensation per temperature 1o C 6 S 1 Input of ZERO compensation 7 S 2 Input of coefficient com...

Страница 7: ...reference value for analog output MTC temperature correction Input of ZERO compensation Input of compensation per temp 1o C Cleaning period min Setting of damping Input of coefficient compensation Del...

Страница 8: ...ERO Mode by pressing the key The key carries out the calibration The whole FND blinks and then the buzzer rings when completed Save the calibration by pressing the key When the ZERO calibration is sav...

Страница 9: ...TC This function should be carried out when the calibration of temperature is needed Pressing the key three times will make C 1 Mode appear The figures will blink when the key is pressed You can chang...

Страница 10: ...be carried out when a correction is needed according to the temperature specification of the electrode The C 3 Mode will be available when the key is pressed five times The value will blink when the...

Страница 11: ...he is pressed Input a value using and keys When the input of data is completed press the key 3 Setting of damping This setting is performed when at the execution of real time measurement severe fluctu...

Страница 12: ...ion sets the ceiling and floor values when SS density values are output in the analog form You can choose 0 1 floor value by pressing the key eleven times and 0 2 ceiling value by pressing it twelve t...

Страница 13: ...nt of cleaning outputs is turned on and then it will be turned off automatically in 10 seconds 14 Installation The body of the instrument is manufactured in accordance with DIN96 standards and can be...

Страница 14: ...ng as instructed check each connection again before supplying power 16 External Appearance 17 Type of problems and troubleshooting Symptoms Causes Actions Displayed value flickers greatly accumulation...

Страница 15: ...out of a fuse Supply of power Change of the voltage switch 110 220 Replacement of a fuse Even though the replacement period of a sensor may differ depending on the on site circumstances it is general...

Страница 16: ...rom various power sources of a plant facility consequently take extra care for the grounding of the instrument in order to eliminate measurement errors It should be noted that accurate indications may...

Страница 17: ...iod are at user s account based on types of services provided as specified in the company regulation 19 2 Requests for after services and consultations 1 Please contact either our A S center at 02 858...

Отзывы: