21
/
26
B3 ESS Unit User Manual
The circuit breaker is installed between the battery module and the inverter, as shown in Figure
3-8:
Figure3-8
Note:
1. After the whole system connection,set the master DIP mode according to the inverter model
firstly,then start the battery.
2. The BAT-INV comms cable is from inverter comm port to master CAN IN port,BAT-BAT cable is
from master CAN OUT to slave1 CAN IN,slave1 CAN OUT to slave2 CAN IN…
3. Each pair of power cable,it’s limited continuous current is 120A,so if the inverter Max.work
current more than 120A,please add power cable according to the proportion.
Note: For more information of matching inverter brands, please subject to the latest document
<The list of compatibility between Dyness ESS and Inverters >.
Dyness compati
bal list-Final-LV&HV-F-2022V2-Y-Solis LV updated.pdf
Содержание B3
Страница 1: ...1 26 B3 ESS Unit User Manual ...