8.4 Running-in instructions
8.4.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.4.2 After 25 operating hours
1.
Change the engine oil.
2.
Check the valve clearance, adjust if necessary
8.7.2 „Checking, adjusting the valve clearance“ on page 77
3.
Check engine and machine for leaks.
4.
Retighten the fastening screws on air filter, exhaust and other
attachments.
5.
Retighten the bolted connections on the machine.
6.
Check the V-belt.
7.
Check the oil level in the exciter shaft housing.
Maintenance – Running-in instructions
DFP12D
70
Содержание DFP12D
Страница 2: ...2...
Страница 6: ...Table of contents DFP12D 6...
Страница 7: ...1 Introduction Introduction DFP12D 7...
Страница 11: ...2 Technical data Technical data DFP12D 11...
Страница 15: ...3 Concerning your safety Concerning your safety DFP12D 15...
Страница 35: ...Brief operating instructions Fig 15 Concerning your safety Signage DFP12D 35...
Страница 37: ...4 Indicators and control elements Indicators and control elements DFP12D 37...
Страница 42: ...Indicators and control elements Transport wheels DFP12D 42...
Страница 43: ...5 Checks prior to start up Checks prior to start up DFP12D 43...
Страница 50: ...Checks prior to start up Checking the water level topping up DFP12D 50...
Страница 51: ...6 Operation Operation DFP12D 51...
Страница 59: ...7 Loading transporting the machine Loading transporting the machine DFP12D 59...
Страница 64: ...Loading transporting the machine Transport wheels DFP12D 64...
Страница 65: ...8 Maintenance Maintenance DFP12D 65...
Страница 90: ...Maintenance As required DFP12D 90...
Страница 91: ...9 Troubleshooting Troubleshooting DFP12D 91...
Страница 95: ...10 Disposal Disposal DFP12D 95...
Страница 97: ......
Страница 98: ......