Leaders in Pipelin
e Survey Systems
C
C
C
-
-
-
S
S
S
C
C
C
A
A
A
N
N
N
2
2
2
0
0
0
1
1
1
0
0
0
SYSTEM MANUAL Version 6.03i
59
9. EXAMPLES
9.1. Example 1
Survey shows 6 survey points
taken over 3,776ft.
These two anomaly areas
were identified by the high
attenuations seen between
survey points #1
#2 and
#4
#5
A C-SCAN Close Interval
survey was then carried out
from just before survey point
#1. The resulting current-only
survey identified the defect –
located in mid-point of the
steep drop in current.
Images taken from DCAPP.