- 4 -
In the United States:
DXV
One Centennial Avenue
Piscataway, New Jersey 08855
Attention: Director of Customer Care
For residents of the United States, warranty
information may also be obtained by calling
the following toll free number: (800) 227-2734
www.DXV.com
In Canada:
DXV
5900 Avebury Road
Mississauga, Ontario
L5R 3M3
Canada
Toll Free: 1-800-387-0369
Local: 905-306-1093
Fax: 1-800-395-1498
www.DXV.ca
In Mexico:
DXV
Via Morelos 330
Col. Santa Clara Coatitla
Ecatepec, Estado de México 55540
Toll Free: 01-800-8391200
www.DXV.mx
770283-100 (2/2020)
10
Align slots in metal console with holes in marble side panel using a small flashlight to visually see where the hole locations are,
position the marble side panel
(5 or 6)
with that of the slots on the metal console frame. Place a washer over one of the
supplied 10-32 x 1
"
screws and place through the slot of the metal console into one of the screw holes of the marble
side panel
(5 or 6)
. 4 screws are required for each marble panel. Ensure rear of side marble panel
(5 or 6)
is flush to rear
of marble top
(4)
. Tighten in place.
Do not over tighten!
Once side marble panel
(5 & 6)
are installed to marble top
(4)
,
check to determine if the side panels are approximately at the same level as the top surface of the marble top.
Slight adjustment to the side marble panels can be made to accomplish this.
Install faucet and drain to sink according to manufacturer’s instructions.
Complete installation of drain and water supply lines per manufacturer’s instructions.
Position completed assembly upright against the wall over drain and water supply lines. Level marble top front to back and
side to side. Adjust level using adjustable feet on the bottom of metal console frame legs
(1 & 2)
. Pre-drill 2 pilot holes in
the rear of the wooden marble top and screw marble top to wall into cross support or stud behind finished wall using
#10 x 2
"
wood screws (NOT SUPPLIED) to securely attach console to wall.
NOTE:
The console must be fully attached to the wall.
After the drain and water supply lines have been connected and checked for leaks, carefully place the glass shelf
(7)
onto the shelf support studs on the lower portion of the console assembly.
11
13
12
14
9
Position metal console rear side flush to the rear of the marble top
(4)
.
Using supplied #10x2" wood screws and washers, screw console
frame to wooden portion of marble top
(4)
following predrilled pilot
holes.
4 screws are required for each side. Slots are provided in
the frame for alignment of frame to rear of marble.
Tighten into place.