- 4 -
6.
Install the resonator and Hot Rodz® assembly to the antenna mast.
7.
Adjust the stainless steel rods and the whip (if installed) for the lowest SWR for the desired
frequency.
8.
Refer to 'Determining the Length of the Rods" for rod lengths.
Figure 1 - Typical installation - optional RM-40 resonator shown as an example.