- 6 -
Guying
Guying of vertical tubing is strongly recommended for stability. A four level, four point guying scheme
provides the best mechanical advantage to prevent wind stress, regardless of direction. The guy lines
should also be used during raising or lowering to minimize stress on the lower tube sections.
Guy Ring
kits are
available from DX
Engineering, you can
choose the kit that best
fits your needs:
DXE-GR-4P
DXE-GR-5P
DXE-GR-2P
As an example, the
suggested
guying
scheme for a 46 foot
assembly is shown.
Your results may vary
since it depends on the
length (height) of your
particular installation.
Guying of vertical
tubing is strongly
recommended for
stability.